The content of this template is expected to be fill out for M1 Release Planning Milestone.

Info
titleInfo

Use the "Copy" and "Move" options (available under the ..., top right of this page) to duplicate this template into your project wiki.
Use the Wiki to document the release plan. Don't provide PowerPoint.
Use as much diagrams and flow charts as you need, directly in the wiki, to convey your message.

Table of Contents
outlinetrue

Overview

Project NameEnter the name of the project
Target Release NameEnter the name of the release you are targeting to deliverBeijing
Project Lifecycle StateEither Incubation, Core, Mature. Refer to ONAP Charter, section 3.3 Project Lifecycle for further information
Participating Company List the company participating in this release. At least 3-4 organizations, including an operator are recommended.Amdocs, AT&T, China Mobile, Huawei, Orange, Tech Mahindra,

Scope

What is this release trying to address?

Describe the problem being solved by this releaseFor the Beijing release, the vvp project adds no new functionality, but the code delivered late in the Amsterdam release is integrated into the Beijing release plan. 

Use Cases

...

  1. We will not target any specific use case as the VNF Validation Program is focused on developing a mechanism for any VNF to obtain a ONAP Compatible Label

Minimum Viable Product

Describe the MVP for this releaseThe MVP for Amsterdam will create the necessary framework and guidance to allow any 3rd party to acquire the ability to obtain an ONAP Compatible Label. The key here is to provide the necessary tracking and mechanisms to both carryout the validations and also to manage which 3rd parties have been approved to carry out such validations.

Functionalities

List the functionalities that this release is committing to deliver by providing a link to JIRA Epics and Stories. In the JIRA Priority field, specify the priority (either High, Medium, Low). The priority will be used in case de-scoping is required. Don't assign High priority to all functionalities.

For the Beijing release, the vvp project adds no new functionality, but the code delivered late in the Amsterdam release is integrated into the Beijing release plan. 

Epics

Jira
serverONAP JIRA
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
maximumIssues20
jqlQueryproject=sanbox vvp and issuetype in (epic=epic and (fixVersion=EMPTY or fixVersion=Beijing)
serverId425b2b0a-557c-3c0c-b515-579789cceedb

...

Jira
serverONAP JIRA
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
maximumIssues20
jqlQueryproject=sanbox vvp and issuetype in (story) and (fixVersion=EMPTY or fixVersion=Beijing)
serverId425b2b0a-557c-3c0c-b515-579789cceedb

...

Indicate at a high level the longer term roadmap. This is to put things into the big perspective.

The test scripts in vvp/test-scripts are used to validate compliance with VNF Requirments.  Currently these are focussed on VNFs packaged in HEAT templates. These need to expand in future releases to accommodate changes in VNF Requirments and  adoption of TOSCA formatted VNFs.

The other repos provide a tool for standalone validation of VNF packages. these same tests are likely to be also made available through VNF SDK and SDC projects in future. 

Release Deliverables

Indicate the outcome (Executable, Source Code, Library, API description, Tool, Documentation, Release Note...) of this release.

Deliverable NameDeliverable Description
release notesno new functionality beyond current code base expectedTo fill outTo fill out

Sub-Components

List all sub-components part of this release.
Activities related to sub-components must be in sync with the overall release.

...

AreaActual LevelTargeted Level for current ReleaseHow, EvidencesComments
PerformanceNANAvvp is a stand alone tool not a platform component
  • 0 -- none
  • 1 – baseline performance criteria identified and measured
  • 2 & 3 – performance improvement plans created & implemented
StabilityNANAvvp is a stand alone tool not a platform component
  • 0 – none
  • 1 – 72 hours component level soak w/random transactions
  • 2 – 72 hours platform level soak w/random transactions
  • 3 – 6 months track record of reduced defect rate
ResiliencyNANAvvp is a stand alone tool not a platform component
  • 0 – none
  • 1 – manual failure and recovery (< 30 minutes)
  • 2 – automated detection and recovery (single site)
  • 3 – automated detection and recovery (geo redundancy)
SecurityNANAvvp is a stand alone tool not a platform component
  • 0 – none
  • 1 – CII Passing badge + 50% Test Coverage
  • 2 – CII Silver badge; internal communication encrypted; role-based access control and authorization for all calls
  • 3 – CII Gold
ScalabilityNANAvvp is a stand alone tool not a platform component
  • 0 – no ability to scale
  • 1 – single site horizontal scaling
  • 2 – geographic scaling
  • 3 – scaling across multiple ONAP instances
ManageabilityNANAvvp is a stand alone tool not a platform component
  • 1 – single logging system across components; instantiation in < 1 hour
  • 2 – ability to upgrade a single component; tracing across components; externalized configuration management
UsabilityNANAvvp is a stand alone tool not a platform component
  • 1 – user guide; deployment documentation; API documentation
  • 2 – UI consistency; usability testing; tutorial documentation

...

  • API Incoming Dependencies

List the API this project is expecting from other projects.
Prior to Release Planning review, Team Leads must agreed on the date by which the API will be fully defined. The API Delivery date must not be later than the release API Freeze date.

Prior to the delivery date, it is a good practice to organize an API review with the API consumers.

...


VVP does not have APIs with other ONAP components.

  • API Outgoing Dependencies

VVP does not have APIs with other ONAP components.

  • API Outgoing Dependencies

API this project is delivering to other projects.

...

  • Third Party Products Dependencies

Third Party Products mean products that are mandatory to provide services for your components. Development of new functionality in third party product may or not be expected.
List the Third Party Products (OpenStack, ODL, RabbitMQ, ElasticSearch,Crystal Reports, ...).

To fill out
NameDescriptionVersion
Postgresqlobject databaseTo fill outTo fill out
gitrepository
jenkinsCi/CD tool

In case there are specific dependencies  (Centos 7 vs Ubuntu 16. Etc.) list them as well.

  • Testing and Integration Plans

Provide a description of the testing activities (unit test, functional test, automation,...) that will be performed by the team within the scope of this release.

Describe the plan to integrate and test the release deliverables within the overall ONAP system.
Confirm that resources have been allocated to perform such activities.

  • Gaps

This section is used to document a limitation on a functionality or platform support. We are currently aware of this limitation and it will be delivered in a future Release.
List identified release gaps (if any), and its impact.

...

The vvp project has been developed as a containerized service for stand alone operation.

This is being integrated for instanciation by the OOM project

  • Gaps

  • Known Defects and Issues

Provide a link toward the list of all known project bugs.

...

The milestones are defined at the Release Level and all the supporting project agreed to comply with these dates.

11/16/18M0Kickoff
1/18/18M1Planning process Complete
2/12/18M2Functionality Freeze
3/8/18M3API/Data Model Freeze
3/29/18

M4

Code Freeze

4/19/18

RC0

Release Candidate 0

5/23/18

RC1

Release Candidiate 1

5/17/18

RC2

Release Candidiate 2

5/24/18Release DeliveryTarget Release Date
  • Team Internal Milestone

This section is optional and may be used to document internal milestones within a project team or multiple project teams. For instance, in the case the team has made agreement with other team to deliver some artifacts on a certain date that are not in the release milestone, it is erecommended to provide these agreements and dates in this section.

It is not expected to have a detailed project plan.

No additional functionality is expected in Beijing release.

DateProjectDeliverable
To fill outTo fill outTo fill out

...