    Plan would be to start 72 hour longevity testing on 9/30 (after ONS)


 

  1. Action points reviewed
  2. Documentation
    1. Read the docs not getting updated on patch submissions/merges to elalto
      1. Brian to follow up with Eric
    2. Please update integration page with documentation review status 2: El Alto Release Integration Testing Status
  3. El Alto Stability Run Notes
  4. Testing status - last item to be resolved with manual work arounds and completed in Frankfurt
  5. Blockers
    1. Brian to follow up on Multicloud issue with Andrew to see if documentation update is the repair
    2. SDNC 1.7.5 container to be applied manually in oom charts if user is testing this flow
  6. Lab status
    1. nothing new
  7. CSIT
    1. DCAE failures 9 and 10 days old - Marco to reach out to Vijay
      1. DCAE 3 failing due to dfc problem - a good catch by CSIT tests
    2. APPC - brian to send note to taka
    3. SDC - Discussions going on but no results to understand the root cause
  8. Testing categories deferred till next week
  9. release daily job is doing master git clone integration - ignoring command line option for elalto
  10. Round Table


 

  1. Action points follow-up from previous meeting: http://ircbot.wl.linuxfoundation.org/meetings/onap-int/2019/onap-int.2019-10-02-13.00.html
  2. Admin
    1. PTL Election
    2. El Alto
      1. branch, tags
      2. release note
  3. El Alto last miles
    1. Testing Status: 2: El Alto Release Integration Testing Status
    2. Blockers Review: 1: El Alto Release Integration Test Blocking Issues
    3. lab status (windriver / E///,  Orange)
    4. 72h duration test
    5. documentation update
  4. Performance Testing
    1. Longevitiy Lab?
    2. What kind of tests
  5. Frankfurt Epic prioritization
  6. Round Table

...