Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Attendees

DISCUSSION ITEMS LOG


  • The new R7 UseCase/Requirements Release Template from Andy Meyer
  • New home under Architecture (Chaker)
  • Requirements S/C page: Requirements subcommittee
  • VES Specification Review (Albino Pinho Trevor Lovett)
  • ONES Conference April 22
  • New R7 new requirements, currently proposals in R7: Guilin release - functional requirements proposed list
  • Way of Working Process discussion for UseCases/Requirements
  • 5G Service Modeling
    CtgryItemWhoNotes
    Meeting Notes Discussion

    Discussion Notes from 05  

    All Team members

    Pltfm


    PLATFORM TOPICS:

    Controller to NF Association

    See Slides Nov 6, 2018. Development of Controller to NF assignment association S/W.

    CDS, VF-C, APP-C, SDN-R, SDN-C; will the CCSDK "merging" of controllers happen in R6?

    USE CASE REALIZATION MEETING (Notes 2018-11-6) Ctrl-NF

    Use Case

    PLATFORM TOPICS:

    Data Persistency, RunTime DB

    RunTime Config DB is now a R6 use case :

    USE CASE REALIZATION MEETING (Notes 2019-01-30) U/C Cross-Interaction, Persistency

    5G CONFIGURATION (RunTime DB)

    Jan 22 - CMNotify; SA5 3GPP Meeting. CMNotify domain. VES Event spec 7.1.1. Alok Gupta has not updated the VES event. On a leave of absence (Hip surgery). CMNotify is going to be done by Nokia. Sync with Sandeep Shah

    Pltfm

    PLATFORM TOPICS:

    Controller LCM API Evolution

    https://wiki.onap.org/download/attachments/50202249/2019-04-09%20ONAP_LCM_API_Evolution_El_Alto.pptx?api=v2

    Goals (Architecture Evolution)
    • Target is common LCM API in CCSDK usable by different controller personas to simplify for both clients and controller implementations
    • Support PNFs for applicable LCM operations in a consistent way
    • Enable use of CDS blueprint processor to customize behavior of LCM operations in the 'self-service' category
      • In ONAP R4, CDS can be used for pre/post-instantiation configuration. Generic and model-driven design should allow CDS usage to be extended for additional operations and use cases.
    • Evolution steps that preserve backwards compatibility for clients

    Present at the Arch S/C Apr 9 (Tue) second presentation.

    Use Cases

    USE CASE/5G:

    RAN (ORAN-3GPP) Standards Harmonization with ONAP

    • Orchestration at the Edge.
    • A1/O1/E2 communications. Edge to ENBs, Telemetry.
    • E2 will not have this info. O1 is I/F for PM counts. Not a management I/F.
    • WG3 (ORAN) is defining this.
    • ONAP w/ O1. Changes w/ O1 interface.
    • How to satisfy A1/O1 and in what time-frame.
    • U/C ORAN - ONAP harmonization. 3GPP ORAN ONAP.
    • Starting a new U/C in 5G. Marge, Vimal, Fred Feisullin
    • Edge inventory & topology. Transport BH consideration w/ real-time near-RT aspects
    • Akraino. MEC. Edge automation (Ramki).

    Use Case WIKI: MOBILITY STANDARDS HARMONIZATION WITH ONAP

    Use Cases

    USE CASE/5G:

    Licensing Management

    New U/C added to the 5G Use Cases Wiki: LICENSING MANAGEMENT

    (Oct 8 2019) Arch Samuli presented on Licensing Management.

    Modeling work: ONAP R6 Modeling High Level Requirements

    Kevin Skaggs Proposed Licensing Platform Model

    Use Cases

    USE CASE/5G:

    OOF / SON / PCI

    PoC for December 2019? SDN-R south-bound NetConf I/F w/ model

    and also integration with Runtime DB work.

    Use Cases

    USE CASES:

    BBS U/C Evolution

    BBS Evolution - Slide set linked in R6 proposed U/C. List of proposals & functional requirements.

    1. Change Service - want to use ONAP platform.
    2. Full Closed Loop for Fault Management - CLAMP.
    3. Service Update API (SO) - will be developed

    https://wiki.onap.org/download/attachments/60887504/BBS_R5_v1.pptx?version=1&modificationDate=1554180715000&api=v2

    Use Cases

    USE CASES/5G:

    PM Dictionary/FM MD GUI

    FM META DATA & PM DICTIONARY in R5
    Use Cases

    USE CASES/5G:

    PNF S/W Upgrade

    PNF software upgrade in R6 Frankfurt
    Use Cases

    USE CASES/5G:

    Preonboarding/Onboarding

    PNF PREONBOARDING / ONBOARDING in R5

    VNF-SDK Artifact package security

    Use CasesUSE CASES:

    IoT Service Creation

    IoT Create Services on 5G

    5G Use Cases in R6 Frankfurt

    June 19, 2019

    Use Cases

    USE CASES:

    Modeling gNB/5G RAN

    Align & harmonize information models to ONAP model and ONAP internal information & data model:

    ETSI SOL001 ... 007 with ONAP internal Model, PNFD modeling (Model S/C), 5G Model (3GPP, RAN), ORAN (WGs, RAN), Open ROADM (reconfig optical add/drop multiplexer, Optical), ONF (Optical), ISOMII (Optical), OTCC (Optical transport config & control)

    Use Cases

    USE CASES:

    5G NRM (Network Resource Model) Configuration

    yaoguang wang

    June 2019 LFN DDF, titled as '5G Provisioning management service to NRM

    Presentation: 5G Network Resource Model (NRM) Configuration in R6 Frankfurt

    Use Cases

    USE CASES:

    PNF / Plug and Play

    Benjamin Cheung

    PNF Plug and Play

    M2/ - Pending 

    Jira
    serverONAP JIRA
    columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
    serverId425b2b0a-557c-3c0c-b515-579789cceedb
    keyREQ-140
    - CMPv2 Security enhancements to AAF (Netconf & PM impacts also).

    Arch

    Architecture S/C

    PNF POB/OB Flow

    Arch S/C Information Flows: Draft ONAP Information Flows

    New Information flow for Preonboarding/Onboarding xNF packages/resources.

    ARCHCOM: InfoFlow - Onboard Resource into SDC Flow

    TSC

    TSC:

    PoC Definition

    POC definition
    TSC

    TSC/USE CASES:

    Test Automation Progress

    Use Case Test Automation

    Action Items: Use case subcommittee to reach the Dublin use case owner to provide the following information. what's the current percentage of testing automation regarding your use case and functional requirements; what will be the plan to be 100% and constraints (resources availability etc.)

    Release TrackingR6 Frankfurt / M2All Team Members

    Use Case Tracking Template

    Need the U/C teams to fill out the Dev. Impacts.

    More Generalized Use Case Template (discussed w/ Model team):

    Use Case Tracking Template and Use Case Template

    Frankfurt Release Requirements

    Demos

    Plug- fest

    Demo Plugfest

    POC & Plugfest in End June 2020

    WINLAB? A1/O1 ORAN & ONAP Joint Plugfest

    Panel Discussion - ? / Maybe in January-February

    Setup. Bronze Release. / Slicing, Heart Beat-Health Check


    Architecture TopicsArchitecture TopicsAll Team Memebers

    Architecture Component Descriptions:

    ONAP Architecture Component Description - Dublin

    Architecture Flows:

    Dublin ONAP Information Flows

    ...