Attendees

DISCUSSION ITEMS LOG

DISCUSSION ITEMS LOG


Discussion Notes from

Pltfm

POC & Plugfest in End June 2020

WINLAB? A1/O1 ORAN & ONAP Joint Plugfest

Panel Discussion - ? / Maybe in January-February

Setup. Bronze Release. / Slicing, Heart Beat-Health Check

CtgryItemWhoNotes
Meeting Notes Discussion

Discussion Notes from

  1. Presentation from Morgan on Integration Project
  2. Testing Automation
  3. Created new MOM page for U/C realization meetings: R7 Use Case Realization Meetings MoM
  4. HackaThon 2020 March 25th Documentation Hackathon
  5. TSC Mar 26  RunTime Cfg DB Project Proposal / Want to make the presentation
  6. Europe Daylight Saving / 5G U/C team call meeting at 11AM EDT
  7. R6 M4 not approved yet. AAF issues. David will be meeting with Catherine today. Milestone tasks. Requirements dependents on AAF. Will try to close M4 soon. RC0 schedule for Mar 26 - likely to be rescheduled. SecCom requirements HTTP port issues Req#231. close out ojsi issues - too large scope. Will affect release day.
  8. Release cadence proposal / Waterfall Agile/Sprint M0-M4. assumptions put a button deployed. Take on one or two sprints each with some requirements, not every project involved in every sprint; project for upcoming sprint, subsequent sprints would be planned. multiple branches. Requirements planning process ongoing process feed into backlog of requirements
  9. ONES Apr 20 Subcommittee mtg ... Apr 22-23 / R7 planning & presentation F2F. will be done virtually is still happening, coordinating via Kenny Paul looking for volunteers to coordinate.

Pltfm


PLATFORM TOPICS:

Controller to NF Association

See Slides Nov 6, 2018. Development of Controller to NF assignment association S/W.

CDS, VF-C, APP-C, SDN-R, SDN-C; will the CCSDK "merging" of controllers happen in R6?

USE CASE REALIZATION MEETING (Notes 2018-11-6) Ctrl-NF

Use Case

PLATFORM TOPICS:

Data Persistency, RunTime DB

RunTime Config DB is now a R6 use case :

USE CASE REALIZATION MEETING (Notes 2019-01-30) U/C Cross-Interaction, Persistency

5G CONFIGURATION (RunTime DB)

Jan 22 - CMNotify; SA5 3GPP Meeting. CMNotify domain. VES Event spec 7.1.1. Alok Gupta has not updated the VES event. On a leave of absence (Hip surgery). CMNotify is going to be done by Nokia. Sync with Sandeep Shah

Pltfm

PLATFORM TOPICS:

Controller LCM API Evolution

https://wiki.onap.org/download/attachments/50202249/2019-04-09%20ONAP_LCM_API_Evolution_El_Alto.pptx?api=v2

Goals (Architecture Evolution)
  • Target is common LCM API in CCSDK usable by different controller personas to simplify for both clients and controller implementations
  • Support PNFs for applicable LCM operations in a consistent way
  • Enable use of CDS blueprint processor to customize behavior of LCM operations in the 'self-service' category
    • In ONAP R4, CDS can be used for pre/post-instantiation configuration. Generic and model-driven design should allow CDS usage to be extended for additional operations and use cases.
  • Evolution steps that preserve backwards compatibility for clients

Present at the Arch S/C Apr 9 (Tue) second presentation.

Use Cases

USE CASE/5G:

RAN (ORAN-3GPP) Standards Harmonization with ONAP

Use Case WIKI: MOBILITY STANDARDS HARMONIZATION WITH ONAP

Use Cases

USE CASE/5G:

Licensing Management

New U/C added to the 5G Use Cases Wiki: LICENSING MANAGEMENT

(Oct 8 2019) Arch Samuli presented on Licensing Management.

Modeling work: ONAP R6 Modeling High Level Requirements

Kevin Skaggs Proposed Licensing Platform Model

Use Cases

USE CASE/5G:

OOF / SON / PCI

PoC for December 2019? SDN-R south-bound NetConf I/F w/ model

and also integration with Runtime DB work.

Use Cases

USE CASES:

BBS U/C Evolution

BBS Evolution - Slide set linked in R6 proposed U/C. List of proposals & functional requirements.

  1. Change Service - want to use ONAP platform.
  2. Full Closed Loop for Fault Management - CLAMP.
  3. Service Update API (SO) - will be developed

https://wiki.onap.org/download/attachments/60887504/BBS_R5_v1.pptx?version=1&modificationDate=1554180715000&api=v2

Use Cases

USE CASES/5G:

PM Dictionary/FM MD GUI

FM META DATA & PM DICTIONARY in R5
Use Cases

USE CASES/5G:

PNF S/W Upgrade

PNF software upgrade in R6 Frankfurt
Use Cases

USE CASES/5G:

Preonboarding/Onboarding

PNF PREONBOARDING / ONBOARDING in R5

VNF-SDK Artifact package security

Use CasesUSE CASES:

IoT Service Creation

IoT Create Services on 5G

5G Use Cases in R6 Frankfurt

June 19, 2019

Use Cases

USE CASES:

Modeling gNB/5G RAN

Align & harmonize information models to ONAP model and ONAP internal information & data model:

ETSI SOL001 ... 007 with ONAP internal Model, PNFD modeling (Model S/C), 5G Model (3GPP, RAN), ORAN (WGs, RAN), Open ROADM (reconfig optical add/drop multiplexer, Optical), ONF (Optical), ISOMII (Optical), OTCC (Optical transport config & control)

Use Cases

USE CASES:

5G NRM (Network Resource Model) Configuration

yaoguang wang

June 2019 LFN DDF, titled as '5G Provisioning management service to NRM

Presentation: 5G Network Resource Model (NRM) Configuration in R6 Frankfurt

Use Cases

USE CASES:

PNF / Plug and Play

Benjamin Cheung

PNF Plug and Play

M2/ - Pending 

Jira
serverONAP JIRA
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
serverId425b2b0a-557c-3c0c-b515-579789cceedb
keyREQ-140
- CMPv2 Security enhancements to AAF (Netconf & PM impacts also).

Arch

Architecture S/C

PNF POB/OB Flow

Arch S/C Information Flows: Draft ONAP Information Flows

New Information flow for Preonboarding/Onboarding xNF packages/resources.

ARCHCOM: InfoFlow - Onboard Resource into SDC Flow

TSC

TSC:

PoC Definition

POC definition
TSC

TSC/USE CASES:

Test Automation Progress

Use Case Test Automation

Action Items: Use case subcommittee to reach the Dublin use case owner to provide the following information. what's the current percentage of testing automation regarding your use case and functional requirements; what will be the plan to be 100% and constraints (resources availability etc.)

Release TrackingR6 Frankfurt / M2All Team Members

Use Case Tracking Template

Need the U/C teams to fill out the Dev. Impacts.

More Generalized Use Case Template (discussed w/ Model team):

Use Case Tracking Template and Use Case Template

Frankfurt Release Requirements

Demos

Plug- fest

Demo Plugfest

POC & Plugfest in End June 2020

WINLAB? A1/O1 ORAN & ONAP Joint Plugfest

Panel Discussion - ? / Maybe in January-February

Setup. Bronze Release. / Slicing, Heart Beat-Health Check


Architecture TopicsArchitecture TopicsAll Team Members

Architecture Component Descriptions:

ONAP Architecture Component Description - Dublin

Architecture Flows:

Dublin ONAP Information Flows


Read the DocsAll members

DOCUMENTATION - Documentation (Read the Docs) - M1 - M4

"Are you referring to MS1 and the preliminary documentation?

https://wiki.onap.org/display/DW/Frankfurt+Documentation

Multiple Repo / Use Cases are under Integration Repo

VNFREQ has Repo / Verified U/C in Integration Repo

Andreas Geissler - Discussed should put docs on the readthedocs (not in wiki)

should have own Repo for Use Cases or Req sub-committee own repo

Discuss w/ Sophia. Linked to completed readthedocs consisting of multiple repos. Make docs inside of components independent of main bulid process. subfolder structure made independent. own RST files for each Use Case. linked into the main docs.

Is multi-repo planned for R7? Integ, SecCom, Architecture.

Hackathon - comming events

CtgryItemWhoNotes
Meeting Notes Discussion

PLATFORM TOPICS:

Controller to NF Association

See Slides Nov 6, 2018. Development of Controller to NF assignment association S/W.

CDS, VF-C, APP-C, SDN-R, SDN-C; will the CCSDK "merging" of controllers happen in R6?

USE CASE REALIZATION MEETING (Notes 2018-11-6) Ctrl-NF

Use Case

PLATFORM TOPICS:

Data Persistency, RunTime DB

RunTime Config DB is now a R6 use case :

USE CASE REALIZATION MEETING (Notes 2019-01-30) U/C Cross-Interaction, Persistency

5G CONFIGURATION (RunTime DB)

Jan 22 - CMNotify; SA5 3GPP Meeting. CMNotify domain. VES Event spec 7.1.1. Alok Gupta has not updated the VES event. On a leave of absence (Hip surgery). CMNotify is going to be done by Nokia. Sync with Sandeep Shah

Pltfm

PLATFORM TOPICS:

Controller LCM API Evolution

https://wiki.onap.org/download/attachments/50202249/2019-04-09%20ONAP_LCM_API_Evolution_El_Alto.pptx?api=v2

Goals (Architecture Evolution)
  • Target is common LCM API in CCSDK usable by different controller personas to simplify for both clients and controller implementations
  • Support PNFs for applicable LCM operations in a consistent way
  • Enable use of CDS blueprint processor to customize behavior of LCM operations in the 'self-service' category
    • In ONAP R4, CDS can be used for pre/post-instantiation configuration. Generic and model-driven design should allow CDS usage to be extended for additional operations and use cases.
  • Evolution steps that preserve backwards compatibility for clients

Present at the Arch S/C Apr 9 (Tue) second presentation.

Use Cases

USE CASE/5G:

RAN (ORAN-3GPP) Standards Harmonization with ONAP

  • Orchestration at the Edge.
  • A1/O1/E2 communications. Edge to ENBs, Telemetry.
  • E2 will not have this info. O1 is I/F for PM counts. Not a management I/F.
  • WG3 (ORAN) is defining this.
  • ONAP w/ O1. Changes w/ O1 interface.
  • How to satisfy A1/O1 and in what time-frame.
  • U/C ORAN - ONAP harmonization. 3GPP ORAN ONAP.
  • Starting a new U/C in 5G. Marge, Vimal, Fred Feisullin
  • Edge inventory & topology. Transport BH consideration w/ real-time near-RT aspects
  • Akraino. MEC. Edge automation (Ramki).

Use Case WIKI: MOBILITY STANDARDS HARMONIZATION WITH ONAP

Use Cases

USE CASE/5G:

Licensing Management

New U/C added to the 5G Use Cases Wiki: LICENSING MANAGEMENT

(Oct 8 2019) Arch Samuli presented on Licensing Management.

Modeling work: ONAP R6 Modeling High Level Requirements

Kevin Skaggs Proposed Licensing Platform Model

Use Cases

USE CASE/5G:

OOF / SON / PCI

PoC for December 2019? SDN-R south-bound NetConf I/F w/ model

and also integration with Runtime DB work.

Use Cases

USE CASES:

BBS U/C Evolution

BBS Evolution - Slide set linked in R6 proposed U/C. List of proposals & functional requirements.

  1. Change Service - want to use ONAP platform.
  2. Full Closed Loop for Fault Management - CLAMP.
  3. Service Update API (SO) - will be developed

https://wiki.onap.org/download/attachments/60887504/BBS_R5_v1.pptx?version=1&modificationDate=1554180715000&api=v2

Use Cases

USE CASES/5G:

PM Dictionary/FM MD GUI

FM META DATA & PM DICTIONARY in R5
Use Cases

USE CASES/5G:

PNF S/W Upgrade

PNF software upgrade in R6 Frankfurt
Use Cases

USE CASES/5G:

Preonboarding/Onboarding

PNF PREONBOARDING / ONBOARDING in R5

VNF-SDK Artifact package security

Use CasesUSE CASES:

IoT Service Creation

IoT Create Services on 5G

5G Use Cases in R6 Frankfurt

June 19, 2019

Use Cases

USE CASES:

Modeling gNB/5G RAN

Align & harmonize information models to ONAP model and ONAP internal information & data model:

ETSI SOL001 ... 007 with ONAP internal Model, PNFD modeling (Model S/C), 5G Model (3GPP, RAN), ORAN (WGs, RAN), Open ROADM (reconfig optical add/drop multiplexer, Optical), ONF (Optical), ISOMII (Optical), OTCC (Optical transport config & control)

Use Cases

USE CASES:

5G NRM (Network Resource Model) Configuration

yaoguang wang

June 2019 LFN DDF, titled as '5G Provisioning management service to NRM

Presentation: 5G Network Resource Model (NRM) Configuration in R6 Frankfurt

Use Cases

USE CASES:

PNF / Plug and Play

Benjamin Cheung

PNF Plug and Play

M2/ - Pending 

Jira
serverONAP JIRA
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
serverId425b2b0a-557c-3c0c-b515-579789cceedb
keyREQ-140
- CMPv2 Security enhancements to AAF (Netconf & PM impacts also).

Arch

Architecture S/C

PNF POB/OB Flow

Arch S/C Information Flows: Draft ONAP Information Flows

New Information flow for Preonboarding/Onboarding xNF packages/resources.

ARCHCOM: InfoFlow - Onboard Resource into SDC Flow

TSC

TSC:

PoC Definition

POC definition
TSC

TSC/USE CASES:

Test Automation Progress

Use Case Test Automation

Action Items: Use case subcommittee to reach the Dublin use case owner to provide the following information. what's the current percentage of testing automation regarding your use case and functional requirements; what will be the plan to be 100% and constraints (resources availability etc.)

Release TrackingR6 Frankfurt / M2All Team Members

Use Case Tracking Template

Need the U/C teams to fill out the Dev. Impacts.

More Generalized Use Case Template (discussed w/ Model team):

Use Case Tracking Template and Use Case Template

Frankfurt Release Requirements

Demos

Plug- fest

Demo PlugfestArchitecture TopicsArchitecture TopicsAll Team Memebers

Architecture Component Descriptions:

ONAP Architecture Component Description - Dublin

Architecture Flows:

Dublin ONAP Information Flows

Frankfurt Release Requirements

...