USE CASE KEY INFORMATION

BASE WIKI
USE CASELEAD CONTACTS / DESCRIPTIONWIKI
PNF Plug and Play5G - PNF Plug and Play
Integration Leads
Requirement IDEpic Jira for the requirement


Jira
serverONAP JIRA
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
serverId425b2b0a-557c-3c0c-b515-579789cceedb
keyREQ-318


SO Story Jira for PnP

Jira
serverONAP JIRA
serverId425b2b0a-557c-3c0c-b515-579789cceedb
keySO-2981


Modeling Story jira for PnP

Jira
serverONAP JIRA
serverId425b2b0a-557c-3c0c-b515-579789cceedb
keyMODELING-368

Architecture Sub-committee Jira trackerArchitecture sub-committee presentation


Jira
serverONAP JIRA
serverId425b2b0a-557c-3c0c-b515-579789cceedb
keyONAPARC-575

Model Place / Geolocation / AAI Schema

Meetings Register

PNFD/SDC AID/AAI Schema Modeling/5G Svc Model - R7 Discussion

Papyrus model:

Proposed Location Model


Generic Information Element Definition

for Geolocation Model

Generic Information Element Definition for Geolocation Model

NON FUNCTIONAL REQUIREMENT CONTRIBUTION

COMPONENTU/C STORY JIRANFR JIRACOMPANYDESCRIPTION
SO

Jira
serverONAP JIRA
serverId425b2b0a-557c-3c0c-b515-579789cceedb
keySO-2981

Jira
serverONAP JIRA
serverId425b2b0a-557c-3c0c-b515-579789cceedb
keyREQ-351

Nokia

Non Functional requirement associated contribution.

No technical dependency/ organizational dependency.

SO NFR Support: Component of SO/LIBs update to Java v11

SO Dashboard


Service Orchestrator Guilin Release M1Benjamin Cheung , Damian Nowak 

BUSINESS DRIVER

This section describes Business Drivers needs.

...

NO IMPACT
PROJECTPTLUser Story / EpicRequirement
A&AINO IMPACT


AAF

EPIC #1

(TEST ONLY / Integration) CMPv2 - Enhanced Secure X.509 Certificate support

(email from Damian Nowak  suggests to remove this dependency - testing will occur with REQ-321)

REQ-318 PNF Plug & Play in R7

I think, we need to remove the dependency to AAF for REQ-318. REQ-318 covers mainly work in the SO component. Looking at PNF PNP feature E2E we might have some relation to REQ-321, but no strict dependency. Perhaps some AAF dependency was mentioned in REQ-318, before REQ-321 was created. I`d remove the AAF dependency from REQ-318 actually.


APPCNO IMPACT


CLAMPNO IMPACT
CC-SDK NO IMPACT
DCAENO IMPACT
DMaaPNO IMPACT
External APINO IMPACT
MODELINGNO IMPACT

Multi-VIM /

Cloud

NO IMPACT
MUSICNO IMPACT
OOFNO IMPACT
POLICYNO IMPACT
PORTALNO IMPACT
SDN-C

EPIC #3

Licensing Management flow w.r.t. PnP (q.v. Licensing Management Use Case)

(Dependency) Enhancements for requesting License Key File (LKF) & Licenses from License Service (message exchange)


SDCNO IMPACT
SO

EPIC #2

Workflow to Building Block Development

and integration

BB execution Framework, extended to understand PNFs.

Preparing input object used for different BBs.

Framework needs to take into PNFs. (Possible debug/work)

(Testing & Integration Work). Environment where this is run

Model parameters added, address the right CDS Blueprint.


VIDNO IMPACT
VF-CYuanhong DengNO IMPACT
VNFRQTSNO IMPACT
VNF-SDKNO IMPACT
CDSNO IMPACT

...

Use cases define how different users interact with a system under design.  Each use case represents an action that may be performed by a user (defined in UML as an Actor with a user persona).

Use Case Diagram Example.pngImage RemovedImage Added

USE CASE FUNCTIONAL DEFINITIONS

Use Case Title

Title of the Use CasePNF Plug and Play - SO Building Block (Work flow)

Actors (and System Components)

The list of Actors and System Components that participate in the Use Case

PNF (5G DU)

ONAP DCAE-VES Event Listener / PRH: PNF Registration Handler

Description

PNF Plug and Play is used for installation and commissioning when a PNF registers with ONAP

Description

Short overview of the Use Case

Points of Contact

Authors and maintainers of the Use Case.

Use Case Lead, Key Use Case members and code contributors.

Benjamin CheungDamian Nowak

Preconditions

Design time activities have occurred, and Stage 1 of the Plug and Play Base Use Cases documented here:

5G - PNF Plug and Play

Preconditions

A list of conditions that are assumed to be true before the Use Case is invoked

Includes description of Information Consumed

Triggers / Begins when

Describes the trigger for beginning the Use CaseThis is used during Installation & Commissioning for Plug and Play when SO needs to initiate the Building Block flow for PnP

Steps / Flows (success)

The flows are documented here:

5G - PNF Plug and Play

Describes the sequence of steps and interactions that occur during the Use Case (may include: description, data exchanges, functionality, state changes)

Interaction diagrams may be included or referenced

Post-conditions

The expected results of the execution of the Use CaseIncludes description of Information Producedpost-conditions are after the flows are after the ConfigDeployPNF.

The workflow has been completed and executed in SO

Alternate / Exception Paths

Description of any exceptions or special process that could occur during Use Case

Errors can occur while executing the AssignPNF BB, Waiting for PNF ready BB, Config Assign PNF BB or Config Deploy PNF BB.

If the Waitfor PNF ready BB waiting for the PNF ready event never arrives because the PNF does not send the PNFRegistration event.

(the full details of the flows are in this wiki: 5G - PNF Plug and Play

Related Use Cases

None

Assumptions

None

Tools / References / Artifacts

References are listed in the base wiki: 5G - PNF Plug and Play

INFORMATION MODEL TEMPLATE

The modeling information for Geolocation can be found here:

Generic Information Element Definition for Geolocation Model

SUPPORTING FILES

TopicFile
Place / Geolocation Parameters & Analysis

ETSI SOL001 proposal -

Geolocation Update

View file
nameNFVSOL(20)000375r1_SOL001ed281_PNFD_geographic coordinates_support.docx
height250

PLACE Proposal (Updated Aug 6 2020)

View file
namePNFPlaceModel_202008Ag06.xlsx
height250
 
View file
nameGeolocationIMProposal_06Ag2020v3.pdf
height250

Related Use Cases

List of the Use Cases referenced by this Use Case

Assumptions

Describes any assumptions that are made for this use case

Tools / References / Artifacts

List of any tools or reference material associated with this Use Case as well as any JIRA trace-ability.

List of any associated diagrams or modelling artifacts associated with the Use Case



TESTING

Current Status

  1. Testing Blockers

  2. High visibility bugs
  3. Other issues for testing that should be seen at a summary level
  4. Where possible, always include JIRA links

END TO END FLOW TO BE TESTED


MEETING LOG

Regular meetings for PNFD/SDC AID/A&AI Schema Moeling and 5G Service Modeling

discussion for Geolocation & Place development for using using Plug and Play.

See this wiki for the Meetings: PNFD/SDC AID/AAI Schema Modeling/5G Svc Model - R7 Discussion

you can watch/listen to previous recordings and meeting at the R6 PnP page: PNF PLUG and PLAY in R6 Frankfurt

TEST CASES AND STATUS


1There should be a test case for each item in the sequence diagram

NOT YET TESTED

2create additional requirements as needed for each discreet step

COMPLETE

3Test cases should cover entire Use Case

PARTIALLY COMPLETE

 Test Cases should include enough detail for testing team to implement the test

 FAILED

...