Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Table of Contents

USE CASE KEY INFORMATION

USE CASELEAD CONTACTS / DESCRIPTIONWIKI
PNF Plug and Play5G - PNF Plug and Play
Integration Leads
Requirement IDEpic Jira for the requirement


Jira
serverONAP JIRA
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
serverId425b2b0a-557c-3c0c-b515-579789cceedb
keyREQ-318


SO Story Jira for PnP

Jira
serverONAP JIRA
serverId425b2b0a-557c-3c0c-b515-579789cceedb
keySO-2981


Modeling Story jira for PnP

Jira
serverONAP JIRA
serverId425b2b0a-557c-3c0c-b515-579789cceedb
keyMODELING-368

SO dashboard

Service Orchestrator Guilin Release M1
Architecture Sub-committee Jira trackerArchitecture sub-committee presentation


Jira
serverONAP JIRA
serverId425b2b0a-557c-3c0c-b515-579789cceedb
keyONAPARC-575

Model Place / Geolocation / AAI Schema

Meetings Register

PNFD/SDC AID/AAI Schema Modeling/5G Svc Model - R7 Discussion

Papyrus model:

Proposed Location Model


Generic Information Element Definition

for Geolocation Model

Generic Information Element Definition for Geolocation Model

NON FUNCTIONAL REQUIREMENT CONTRIBUTION

COMPONENTU/C STORY JIRANFR JIRACOMPANYDESCRIPTION
SO

Jira
serverONAP JIRA
serverId425b2b0a-557c-3c0c-b515-579789cceedb
keySO-2981

Jira
serverONAP JIRA
serverId425b2b0a-557c-3c0c-b515-579789cceedb
keyREQ-351

Nokia

Non Functional requirement associated contribution.

No technical dependency/ organizational dependency.

SO NFR Support: Component of SO/LIBs update to Java v11

SO Dashboard


Service Orchestrator Guilin Release M1

BUSINESS DRIVER

This section describes Business Drivers needs.

...

Use Case Title

PNF Plug and Play - SO Building Block (Work flow)

Actors (and System Components)

PNF (5G DU)

ONAP DCAE-VES Event Listener / PRH: PNF Registration Handler

Description

PNF Plug and Play is used for installation and commissioning when a PNF registers with ONAP

Points of Contact

Benjamin CheungDamian Nowak

Preconditions

Design time activities have occurred, and Stage 1 of the Plug and Play Base Use Cases documented here:

5G - PNF Plug and Play

Triggers / Begins when

This is used during Installation & Commissioning for Plug and Play when SO needs to initiate the Building Block flow for PnP

Steps / Flows (success)

The flows are documented here:

5G - PNF Plug and Play

Post-conditions

The post-conditions are after the flows are after the ConfigDeployPNF.

The workflow has been completed and executed in SO

Alternate / Exception Paths

Description of any exceptions or special process that could occur during Use Case

Related Use Cases

List of the Use Cases referenced by this Use Case

Errors can occur while executing the AssignPNF BB, Waiting for PNF ready BB, Config Assign PNF BB or Config Deploy PNF BB.

If the Waitfor PNF ready BB waiting for the PNF ready event never arrives because the PNF does not send the PNFRegistration event.

(the full details of the flows are in this wiki: 5G - PNF Plug and Play

Related Use Cases

None

Assumptions

None

Assumptions

Describes any assumptions that are made for this use case

Tools / References / Artifacts

List of any tools or reference material associated with this Use Case as well as any JIRA trace-ability.

List of any associated diagrams or modelling artifacts associated with the Use Case

References are listed in the base wiki: 5G - PNF Plug and Play

INFORMATION MODEL TEMPLATE

...

PNFPlaceModel.xlsx250

TopicFile
Place / Geolocation Parameters & Analysis

View file
nameheight

ETSI SOL001 proposal -

Geolocation Update

View file
nameNFVSOL(20)000375r1_SOL001ed281_PNFD_geographic coordinates_support.docx
height250

PLACE Proposal (Updated Aug 6 2020)

View file
namePNFPlaceModel_202008Ag06.xlsx
height250
 
View file
nameGeolocationIMProposal_06Ag2020v3.pdf
height250



TESTING

Current Status

...