 Under investigation- junit tests are Orr

This page summarizes the projects participating into Dublin Release.

...

...


Sign-off

    • 4/11- TSC 2019-04-11
      • 9 out of 29 projects passed. Documentation is now tracked differently
      • M4 scorecard not completed by the Owners
    • 4/18 - TSC 2019-04-18
      • Dublin M4 Milestone (Code Freeze) was passed on April 18th with gating exceptions that will be reviewed on April 25th 2019
    • 4/26
      • M4 Gating exceptions have been cleared
  • RC0/RC1/RC2 Status
    • Not all components were ready - took 1 week to get a phased delivery of components
    • 5/30 - No Go - day2day shift
    • approved on 6/6 by TSC
  • Sign-off
    • 6/6 - No Go 
    • 6/13 - No Go but Excellent progress
    • 6/21 - ONAP Dublin release is now certified. Release note to be finalized.

Dublin Milestones Status



Project NameProject Tech. LeadM0 Kick-Off/Intention Submission

M1

Planning

M2

Functionality freeze

M3

API Freeze

M4
Code Freeze

RC0

Release Candidate 0

RC1

Release Candidate 1

RC2

Release Candidate 2

Sign-Off

Release Delivery

1A & AI Dec 3, 2018

AAI R4 M1 Release Planning

AAI R4 M1 Deliverables for Planning Milestone Checklist

AAI R4 M2 Deliverables for Functionality Freeze Milestone Checklist

...

Project NameProject Tech. LeadM0 Kick-Off/Intention Submission

M1

Planning

M2

Functionality freeze

M3

API Freeze

M4
Code Freeze

RC0

Release Candidate 0

RC1

Release Candidate 1

RC2

Release Candidate 2

Sign-Off

Release Delivery

1A & AI Dec 3, 2018

AAI R4 M1 Release Planning

AAI R4 M1 Deliverables for Planning Milestone Checklist

AAI R4 M2 Deliverables for Functionality Freeze Milestone Checklist

AAI R4 M3 Deliverables for API Freeze Milestone Checklist

2Application Authorization FrameworkDec 3, 2018AAF R4 - M1 Release Plan
AAF R4 - M1 Milestone ChecklistAAF R4 - M2 Functionality Freeze Milestone Checklist
Condition: aaf-authz @55% by M3
AAF R4 -

Conditions: Obtain coverage goal by M4 - Failing Sonar coverage: aaf-authz

Need to update the checklist including Modeling Checklist item

Inprocess Gerrit: https://gerrit.onap.org/r/#/c/78520/

https://gerrit.onap.org/r/#/c/79224/



AAI R4 Deliverables for RC0 Milestone Checklist

AAI R4 Deliverables for RC1 Milestone Checklist

4 Docs jiras - recently updates


AAI R4 Deliverables for RC2 Milestone Checklist


Docs in process

AAI R4 Deliverables for Release Sign-Off Milestone Checklist
2Application Authorization FrameworkDec 3, 2018AAF R4 - M1 Release Plan
AAF R4 - M1 Milestone Checklist
AAF R4 - M2 Functionality Freeze Milestone Checklist
Condition: aaf-authz @55% by M3

AAF R4 -M3

AAF R4 - M4 Deliverable for Code Freeze Milestone Checklist

Open high/highest defect AAF-797

3APPCYes, per default

APPC Dublin M1 Release Planning

APPC Dublin M1 Checklist

APPC Dublin M1 Security Checklist

APPC Dublin M2 Functionality Freeze ChecklistAPPC Dublin M3

Deliverables for API Freeze Milestone Checklist

Template

APPC Dubin M4 Code Freeze Milestone Checklist Template

4CLAMPYes, per defaultCLAMP R4 - M1 Release Planning
CLAMP R4 - M1 Deliverables for Planning Milestone ChecklistCLAMP R4 - M2 Functionality Freeze Milestone Checklist

CLAMP R4 - M3 Deliverables for API Freeze Milestone Checklist

Checklist complete - no swagger API doc

CLAMP R4 - M4 Deliverable for Code Freeze Milestone Checklist

Vulnerability defect open and not deferred:

Jira
serverONAP JIRA
serverId425b2b0a-557c-3c0c-b515-579789cceedb
keyCLAMP-223

Failing CSIT job: clamp-master-csit-UIs

5Common Controller SDKYes, per default

CCSDK : Dublin: Release Planning

CCSDK : Dublin M1 : Deliverables for Planning Milestone

CCSDK : Dublin M2 : Functionality Freeze Milestone Checklist

Condition: All repos unit test coverage > 55% by M3

CCSDK : Dublin M3 : API Freeze Milestone Checklist

Conditions: Unmet Sonar goal: passes as of 2019-04-09

CCSDK : Dublin M4 : Code Freeze Milestone Checklist

Multiple Sonar objective not met (warning): ccsdk-sli-adaptors, ccsdk-sli-core, ccsdk-sli-northbound

6DCAE

Vijay Venkatesh Kumar

Dec 5, 2018

DCAE R4 M1 Release Planning

DCAE R4 M1 Milestone Checklist

DCAE R4 M2 Functionality Freeze Milestone Checklist

DCAE R4 M3 Deliverables for API Freeze Milestone Checklist

Waiver requested, defer coverage goal (55%) for several items until M4:

dcaegen2-collectors-restconf

dcaegen2-collectors-snmptrap

dcaegen2-platform-inventory-api

DCAE R4 M4 Code Freeze Milestone Checklist

Complete transport encryption not implemented - moved to El Alto

Need SECCOM exception for Cloudify running as root, and many items in the Vulnerability report

Failing CSIT job: dcaegen2-collectors-datafile-master-csit-Functional-suite

7DMaaPYes, per defaultDMaaP R4 - M1 Release Planning
DMaaP R4 - M1 Milestone ChecklistDMaaP R4 - M2 Functionality Freeze Milestone Checklist

Conditions: Obtain coverage goal by M4 - Failing Sonar coverage: aaf-authz

Need to update the checklist including Modeling Checklist item

Inprocess Gerrit: https://gerrit.onap.org/r/#/c/78520/

https://gerrit.onap.org/r/#/c/79224/

AAF R4 - M4 Deliverable for Code Freeze Milestone Checklist

AAF R4 (Dublin) - RC0 Milestone Checklist


TSC waiver for Dublin release sought: Sonar goal miss: aaf-authz


AAF R4 - RC1 Milestone Checklist


TSC waiver for Dublin release sought: Sonar goal miss: aaf-authz


AAF R4 - RC2 Milestone Checklist


TSC Waiver for Sonar granted

AAF R4 Deliverables for Release Sign-Off Milestone Checklist
3APPCYes, per default

APPC Dublin M1 Release Planning

APPC Dublin M1 Checklist

APPC Dublin M1 Security Checklist

APPC Dublin M2 Functionality Freeze Checklist

APPC Dublin M3 Deliverables for API Freeze Milestone Checklist Template


APPC Dubin M4 Code Freeze Milestone Checklist Template


APPC Dublin RC0 Milestone Checklist Template



APPC Dublin RC1 Milestone Checklist Template


2 high/highest - no update in last week

4CLAMPYes, per defaultCLAMP R4 - M1 Release Planning
CLAMP R4 - M1 Deliverables for Planning Milestone Checklist
CLAMP R4 - M2 Functionality Freeze Milestone Checklist

CLAMP R4 - M3 Deliverables for API Freeze Milestone Checklist


Checklist complete - no swagger API doc

CLAMP R4 - RC0 Milestone ChecklistCLAMP R4 - RC1 Milestone Checklist

CLAMP R4 - RC2 Milestone Checklist 


CLAMP R4 - Deliverables for Release Sign-Off Milestone Checklist
5Common Controller SDKYes, per default

CCSDK : Dublin: Release Planning

CCSDK : Dublin M1 : Deliverables for Planning Milestone

CCSDK : Dublin M2 : Functionality Freeze Milestone Checklist

Condition: All repos unit test coverage > 55% by M3

, non-root post Dublin

CCSDK : Dublin M3 :

DMaaP R4 - M3

API Freeze Milestone Checklist

Gerrit- Review

https://gerrit.onap.org/r/#/c/79574/

Modeling request for data model: "waiting on modeling team."

Conditions: Unmet Sonar goal: passes as of 2019-04-09


DMaap R4 - M4

Containers running as root:BusController

Failing CSIT: master-csit-mrpubsub

No plan to close documentation tickets

8DocumentationYes, per default

Planning worksheet

M1 Documentation Dublin Release

MS2 Deliverables for Functionality Freeze Milestone Checklist Template

Condition: Followup to document the doc deliverables overtime so that rel_mgmt can support the deliverables


CCSDK : Dublin RC1 : Deliverables for RC1 Milestone Checklist



6DCAEDec 5, 2018

DCAE R4 M1 Release Planning

DCAE R4 M1 Milestone Checklist

DCAE R4 M2 Functionality Freeze Milestone Checklist

DCAE R4 M3 Deliverables for API Freeze Milestone Checklist

Waiver requested, defer coverage goal (55%) for several items until M4:

dcaegen2-collectors-restconf

dcaegen2-collectors-snmptrap

dcaegen2-platform-inventory-api

DCAE R4 RC0 Milestone Checklist



DCAE R4 RC1 Milestone Checklist

1 Doc Jira Ticket

7DMaaPMandar SawantYes, per defaultDMaaP R4 - M1 Release Planning
DMaaP R4 - M1 Milestone Checklist
DMaaP R4 - M2 Functionality Freeze Milestone Checklist Condition: All repos unit test coverage > 55% by M3, non-root post Dublin

DMaaP R4 - M3 API Freeze Milestone Checklist

Gerrit- Review

https://gerrit.onap.org/r/#/c/79574/

Modeling request for data model: "waiting on modeling team."

DMaap R4 - M4 Code Freeze Milestone Checklist

Swagger docs by RC2

DMaaP R4 - RC0 Milestone Checklist



DMaaP R4 - RC1 Milestone Checklist

DMaaP R4 - RC2 Milestone Checklist


DMaaP R4 - Release Sign-Off Milestone Checklist Template
8DocumentationYes, per default

Planning worksheet

M1 Documentation Dublin Release

MS2 Deliverables for Functionality Freeze Milestone Checklist Template

Condition: Followup to document the doc deliverables overtime so that rel_mgmt can support the deliverables

Moving to weekly documentation report... no checklist







9External API FrameworkDec 5, 2018Planning worksheet
M1 Checklist

[ExtAPI] Dublin M3 API Freeze Milestone Checklist


ExtAPI Dublin M4 Code Freeze Milestone Checklist

Project needs help getting signed certificates

ExtAPI Dublin RC0 Checklist



[ExtAPI] Dublin RC1 Checklist

2x Doc Jira Tickets

[ExtAPI] Dublin RC2 Checklist


External API Deliverables for Dublin R4 Release Sign-Off Milestone Checklist
10HolmesDec 3, 2018

Holmes Release Planning for Dublin

Holmes

Moving to weekly documentation report... no checklist

9External API FrameworkDec 5, 2018Planning worksheet
M1 Checklist

[ExtAPI] Dublin M3 API Freeze Milestone Checklist

ExtAPI Dublin M4 Code Freeze Milestone Checklist

Project needs help getting signed certificates

10HolmesDec 3, 2018

Holmes Release Planning for Dublin

Holmes Deliverables for Planning Milestone Checklist for Dublin

Holmes Deliverables for Functionality Freeze Milestone Checklist for Dublin
Condition: holmes-common @55% by M3 (TBC) Non-root by 2019-02-28

Holmes Deliverables for API Freeze Milestone Checklist for Dublin

Holmes Deliverables for Code Freeze Milestone Checklist Template for Dublin

Moving some stories to next release due to lack of resource. No impact existing func.

11

Integration

Yes, per default

Integration Dublin M1 Deliverables for Planning Milestone Checklist

Integration Dublin M2 Deliverables for Functionality Freeze Milestone Checklist
Provide status on the plan to close the blocker(s).

Integration Dublin M3 Deliverables for API Freeze Milestone Checklist

Need to understand if Integration has sufficient lab capacity for Dublin and a quick to follow maintenance release.

Integration Dublin M4 Deliverable for Code Freeze Milestone Checklist12

Logging Enhancements Project

Including POMBA

Nov 16, 2018Logging Dublin M1 Release Planning
Logging Dublin Deliverables for Planning Milestone ChecklistLogging Dublin M2 Deliverables for Functionality Freeze Milestone Checklist

Logging Dublin M3 Deliverables for API Freeze Milestone Checklist Template

Checklist complete. No swagger API data

Logging Dublin M4 Deliverable for Code Freeze Milestone Checklist Template

Incomplete checklist

13Microservices BusNov 30, 2018

MSB Release Planning for Dublin

MSB

Deliverables for Planning Milestone Checklist for Dublin

MSB Dubin
Holmes Deliverables for Functionality Freeze Milestone Checklist
-M2MSB Deliverables
for
API Freeze Milestone Checklist for Dublin
Dublin
Condition: holmes-common @55% by M3 (TBC) Non-root by 2019-02-28

Holmes Deliverables for API Freeze Milestone Checklist for Dublin


Holmes

MSB

Deliverables for Code Freeze Milestone Checklist Template for Dublin

Open "high" vulnerability Jira

Jira
serverONAP JIRA
serverId425b2b0a-557c-3c0c-b515-579789cceedb
keyMSB-327

SECCOM exception sought: Container running as root

Huabing Zhao: Container running as root was done.

Jira
serverONAP JIRA
serverId425b2b0a-557c-3c0c-b515-579789cceedb
keyMSB-320

Jira
serverONAP JIRA
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
serverId425b2b0a-557c-3c0c-b515-579789cceedb
keyMSB-321

Jira
serverONAP JIRA
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
serverId425b2b0a-557c-3c0c-b515-579789cceedb
keyMSB-322

Conflicting info on containers running as root in checklist - email sent 20190411:0711

14ModelingDec 3, 2018Modeling Dublin Planning
Modeling Dublin Deliverables for Planning Milestone Checklist

Modeling Dublin Deliverables for Functionality Freeze Milestone Checklist

Condition: unit test coverage > 55% by M3

Modeling Dublin Deliverables for API Freeze Milestone Checklist

Condition: meet 55% coverage goal by M4

Sonar reporting warning: modeling-toscaparsers-javatoscachecker

Modeling Dublin Deliverable for Code Freeze Milestone Checklist

High/highest Dublin open:

Jira
serverONAP JIRA
serverId425b2b0a-557c-3c0c-b515-579789cceedb
keyMODELING-155
Jira
serverONAP JIRA
serverId425b2b0a-557c-3c0c-b515-579789cceedb
keyMODELING-143

15Multi VIM/CloudDec 3, 2018

MultiCloud Dublin Release Planning

Deliverables for Planning Milestone Checklist

Deliverables for Functionality Freeze Milestone Checklist

  1. Conditions: Get all remaining unit test code coverage > 55% by M3
  2. Plan to design container(s) as non-root: M3 Dublin

MultiCloud R4 Deliverables for API Freeze Milestone Checklist

Conditional:

Need to add Modeling checklist item

Review gerrit (stale merges)

https://gerrit.onap.org/r/#/c/76324/

https://gerrit.onap.org/r/#/c/75851/

MultiCloud R4 Deliverable for Code Freeze Milestone Checklist

Failing Jenkins job: multicloud-framework-master-docker-java-version-shell-daily

16MUSICYes, per default

MUSIC Dublin Release Planning

MUSIC Dublin M1 Deliverables for Planning Milestone Checklist

MUSIC Dublin M2 Deliverables for Functionality Freeze Milestone Checklist Template Condition: unit test coverage > 55% by M3.

MUSIC Dublin M3 Deliverables for API Freeze Milestone Checklist

MUSIC Dublin M4 Code Freeze Milestone Checklist17ONAP CLIDec 3, 2018

Dublin-M1-CLI Deliverable

Dublin-M1-CLI Release planning

Dublin-M2-Checklist

Dublin-M3 checklist

Need to update the checklist including Modeling and additional Integration Checklist item

Dublin M4 Code Freeze Milestone Checklist18ONAP Operations ManagerDec 3, 2018OOM - Deliverables for Planning Milestone Checklist
OOM Dublin Release Planning Template

OOM Dublin - M2 Functionality Freeze Milestone Checklist

OOM Dublin - M3 API Freeze Milestone Checklist

-Review gerrit: https://gerrit.onap.org/r/#/c/72189/

https://gerrit.onap.org/r/#/c/80030/

https://gerrit.onap.org/r/#/c/78353/

https://gerrit.onap.org/r/#/c/79268/

https://gerrit.onap.org/r/#/c/79990/

https://gerrit.onap.org/r/#/c/79347/

https://gerrit.onap.org/r/#/c/79989/

https://gerrit.onap.org/r/#/c/79330/

https://gerrit.onap.org/r/#/c/79985/

https://gerrit.onap.org/r/#/c/78873/

https://gerrit.onap.org/r/#/c/77439/

See mitigation efforts for 20+ reviews - 5 are pending manual HC/pods results, one merge conflict


Moving some stories to next release due to lack of resource. No impact existing func.

Holmes Deliverables for RC0 Milestone for Dublin


Holmes Deliverables for RC1 Milestone for DublinHolmes Deliverables for RC2 Milestone for DublinHolmes Deliverables for Release Sign-Off Milestone Checklist for Dublin
11Integration ProjectYes, per default

Integration Dublin M1 Deliverables for Planning Milestone Checklist

Integration Dublin M2 Deliverables for Functionality Freeze Milestone Checklist
Provide status on the plan to close the blocker(s).

Integration Dublin M3 Deliverables for API Freeze Milestone Checklist

Need to understand if Integration has sufficient lab capacity for Dublin and a quick to follow maintenance release.

Integration Dublin M4 Deliverable for Code Freeze Milestone Checklist

Integration Dublin RC0 Milestone Checklist


Integration Dublin RC1 Milestone ChecklistIntegration Dublin RC2 Milestone Checklist

Integration R4 Deliverables for Release Sign-Off Milestone Checklist



12

Logging Enhancements Project

Including POMBA

Nov 16, 2018Logging Dublin M1 Release Planning
Logging Dublin Deliverables for Planning Milestone Checklist
Logging Dublin M2 Deliverables for Functionality Freeze Milestone Checklist

Logging Dublin M3 Deliverables for API Freeze Milestone Checklist Template

Checklist complete. No swagger API data

Logging Dublin M4 Deliverable for Code Freeze Milestone Checklist Template

Logging Dublin RC0 Deliverables for RC0 Milestone Checklist



Logging Dublin RC1 Deliverables for RC1 Milestone Checklist



Logging Dublin RC2 Deliverables for RC2 Milestone Checklist

POMBA docs 

Logging Dublin Deliverables for Release Sign-Off Milestone Checklist Template


13Microservices BusNov 30, 2018

MSB Release Planning for Dublin

MSB Deliverables for Planning Milestone Checklist for Dublin

MSB Dubin Deliverables for Functionality Freeze Milestone Checklist-M2

MSB Deliverables for API Freeze Milestone Checklist for Dublin


MSB Deliverables for RC0 Milestone for Dublin

MSB Deliverables for RC1 Milestone for DublinMSB Deliverables for RC2 Milestone for DublinMSB Deliverables for Release Sign-Off Milestone Checklist for Dublin
14ModelingDec 3, 2018Modeling Dublin Planning
Modeling Dublin Deliverables for Planning Milestone Checklist

Modeling Dublin Deliverables for Functionality Freeze Milestone Checklist

Condition: unit test coverage > 55% by M3

Modeling Dublin Deliverables for API Freeze Milestone Checklist

Condition: meet 55% coverage goal by M4

Sonar reporting warning: modeling-toscaparsers-javatoscachecker

Modeling Dublin Deliverables for RC0 Milestone Checklist




Modeling Dublin Deliverables for RC1 Milestone ChecklistModeling Dublin Deliverables for RC2 Milestone ChecklistModeling Dublin Deliverables for Release Sign-Off Milestone Checklist Template
15Multi VIM/CloudDec 3, 2018

MultiCloud Dublin Release Planning

Deliverables for Planning Milestone Checklist

Deliverables for Functionality Freeze Milestone Checklist

  1. Conditions: Get all remaining unit test code coverage > 55% by M3
  2. Plan to design container(s) as non-root: M3 Dublin

MultiCloud R4 Deliverables for API Freeze Milestone Checklist

Conditional:

Need to add Modeling checklist item

Review gerrit (stale merges)

https://gerrit.onap.org/r/#/c/76324/

https://gerrit.onap.org/r/#/c/75851/

MultiCloud R4 Deliverable for Code Freeze Milestone Checklist

MultiCloud Deliverables for RC0 Milestone Checklist



TSC waiver for Dublin release sought: Sonar multicloud-azure below target

MultiCloud R4 Deliverables for RC1 Milestone Checklist

TSC waiver for Dublin release sought: Sonar multicloud-azure below target

16MUSICYes, per default

MUSIC Dublin Release Planning

MUSIC Dublin M1 Deliverables for Planning Milestone Checklist

MUSIC Dublin M2 Deliverables for Functionality Freeze Milestone Checklist Template Condition: unit test coverage > 55% by M3.

MUSIC Dublin M3 Deliverables for API Freeze Milestone Checklist




MUSIC Dublin M4 Code Freeze Milestone Checklist

MUSIC Dublin RC0 Milestone Checklist







https://wiki.onap.org/display/DW/MUSIC+Dublin+RC1+Milestone+Checklist

MUSIC Dublin RC2 Milestone Checklist


MUSIC Dublin Deliverables for Release Sign-Off Milestone Checklist
17ONAP CLIDec 3, 2018

Dublin-M1-CLI Deliverable

Dublin-M1-CLI Release planning

Dublin-M2-Checklist

Dublin-M3 checklist

Need to update the checklist including Modeling and additional Integration Checklist item

Dublin M4 Code Freeze Milestone Checklist

Dublin-RC0 Milestone Checklist


Dublin-RC1 Milestone Checklist

Old version in Dublin - 

Jira
serverONAP JIRA
serverId425b2b0a-557c-3c0c-b515-579789cceedb
keyCLI-168

Dublin-RC2 Milestone ChecklistDublin-Release Sign-Off
18ONAP Operations ManagerDec 3, 2018OOM - Deliverables for Planning Milestone Checklist
OOM Dublin Release Planning Template

OOM Dublin - M2 Functionality Freeze Milestone Checklist


OOM Dublin - M3 API Freeze Milestone Checklist

a couple are transitioning between developers OOM Meeting Notes - 2019-03-13


Not all committed functionality delivered - moved to El Alto

Outstanding license issues

Open "high/highest" defects

OOM Dublin - RC0 Milestone Deliverables Checklist


OOM Dublin - RC1 Milestone Deliverables Checklist



19ONAP Optimization Framework
Sarat Puthenpura
Dec 3, 2018OOF Dublin M1 Deliverables for Planning Milestone Checklist
OOF Dublin M1 Release Planning
OOF Dublin M2 Functionality Freeze Milestone Checklist Condition: unit test coverage > 55% by M3

OOF Dublin M3 Deliverables for API Freeze Milestone Checklist

Checklist complete.

Conditional: Complete unit test coverage goal by M4 for HAS

and CMSO

OOM-CSIT BY M4

OOF Dublin M4 Code Freeze Milestone Checklist

optf-cmso not meeting Sonar goal

Open/Inprocess vulnerability defects:

Jira
serverONAP JIRA
serverId425b2b0a-557c-3c0c-b515-579789cceedb
keyOPTFRA-397
Jira
serverONAP JIRA
serverId425b2b0a-557c-3c0c-b515-579789cceedb
keyOPTFRA-431

and CMSO

OOM-CSIT BY M4

OOF Dublin RC0 Milestone Checklist

OOF Dublin RC2 Milestone Checklist


Doc completion risk - focus on release notes & install docs

Failing CSIT job: optf-osdf-master-csit-osdf



20ONAP Usecase UIYes, per default

Usecase-UI Beijing Release Planning

Dublin Release M1 Deliverables for Planning Milestone Checklist

UUI Dublin M2 Functionality Freeze Milestone Checklist

Dublin Release M3 Deliverables for API Freeze Milestone Checklist


UUI Dublin M4 Code

Freeze Milestone Checklistvulnerability table not complete

Freeze Milestone Checklist



Dublin Release Deliverables for RC0 Milestone Checklist


Dublin Release Deliverables for RC1 Milestone Checklist

2x Doc Jira Tickets

21Policy FrameworkDec 3, 2018

Policy R4 Dublin M1 Release Planning

Policy R4 Dublin M1 Deliverables for Planning Milestone Checklist Template

Policy R4 Dublin M2 Deliverables for Functionality Freeze Milestone Checklist Template

Policy R4 Dublin M3 Deliverables for API Freeze Milestone Checklist Template


Policy R4 Dublin M4 Deliverable

for Code Freeze Milestone Checklist TemplateSonar below goal: policy-api

for Code Freeze Milestone Checklist Template


Policy R4 Dublin RC0 Deliverables for RC0 Milestone Checklist Template


P-W testing

Policy R4 Dublin RC1 Deliverables for RC1 Milestone Checklist Template

1xDoc Jira Ticket


22Portal PlatformNov 30, 2018Portal R4 M1 Release Planning (Dublin Release)
Portal R4 M1 Deliverables for Planning Milestone Checklist (Dublin Release)
Portal R4 M2 Deliverables for Functionality Freeze Milestone Checklist Dependency on OOM for non-root testing; other dependencies articulated in the risks

Portal R4 M3 Deliverables for API Freeze Milestone Checklist

Need to update the checklist including Integration & Modeling Checklist items



Portal R4 M4

-old

for Code Freeze Milestone Checklist

Using old checklist

Need to have a plan to fix vulnerability dependencies with VID, Portal, Policy, etc.



Portal R4 RC0 Milestone Checklist



=> Tracking as Risk #3 since Jan 8th, 2019



23SDN-CYes, per default

SDNC : Dublin: Release Planning

SDNC : Dublin M1 : Deliverables for Planning Milestone

SDNC : Dublin M2 : Functionality Freeze
Milestone Checklist Condition: Unit test code coverage > 55% by M3
Milestone Checklist

SDNC : Dublin RC0 : Deliverables for RC0 Milestone Checklist


Update certificate in RC1

SDNC : Dublin RC1 : Deliverables for RC1 Milestone Checklist

2 high in Submitted state

Certificate is updated

SDNC Dublin M3 Checklist

M4
Deliverable
Code Freeze

Sonar below goal: sdnc-northbound

Update (Dan Timoney ) : please note that we have always defined 'code coverage' as line coverage. That repo is at 58.3% line coverage, so I think we're okay.



24Service Design & CreationDec 4, 2018

SDC R4 Release Planning

SDC R4 Deliverables for Planning Milestone Checklist

SDC R4 Deliverables for Functionality Freeze Milestone Checklist

Condition: unit test coverage > 55% by M3

SDC R4 Deliverable for Code Freeze

Milestone Checklist

Lack of resources led to partial completion of committed tasks

No encrypt transports AND containers running root - deferred to El Alto

Sonar below goal on numerous repos

25Service OrchestratorDec 2, 2018

SO Dublin M1 Release Planning

SO Dublin M1 Checklist

Service Orchsttrator M2 Checklist

SO M3 Checklist

SO Dublin M4 Code Freeze Milestone Checklist

Integration blockers and "high/highest" open defects

vulnerability table not complete

26VF-C: Virtual Function Controller

Milestone Checklist



SDC R4 Deliverables for RC0 Milestone Checklist


Sonar below goal: sdc master

SDC R4 Deliverables for RC1 Milestone Checklist

Waiver requested: Sonar below goal: sdc master


25Service Orchestrator
Yan Yang

Dec 2, 2018
VF-C

SO Dublin M1 Release Planning

VF-C Dublin: Deliverables for Planning Milestone Checklist

VF-C Dublin: Deliverables for Functionality Freeze Milestone Checklist Template

VF-C Dublin: Deliverables for API Freeze Milestone Checklist Template

Checklist complete. Missing swagger API info

VF-C Dublin: Deliverable for Code Freeze Milestone Checklist Template

Number of open vulnerabilities (4 shown):

Jira
serverONAP JIRA
serverId425b2b0a-557c-3c0c-b515-579789cceedb
keyVFC-1288

Jira
serverONAP JIRA
serverId425b2b0a-557c-3c0c-b515-579789cceedb
keyVFC-1287
Jira
serverONAP JIRA
serverId425b2b0a-557c-3c0c-b515-579789cceedb
keyVFC-1286
Jira
serverONAP JIRA
serverId425b2b0a-557c-3c0c-b515-579789cceedb
keyVFC-1285

Sonar coverage 46%

SO Dublin M1 Checklist

Service Orchsttrator M2 Checklist

SO Dublin RC0: Deliverables for RC0 Milestone Checklist Template


SO Dublin RC1 Milestone Checklist Template

26VF-C: Virtual Function ControllerDec 2, 2018

VF-C Dublin M1 Release Planning

VF-C Dublin: Deliverables for Planning Milestone Checklist

VF-C Dublin: Deliverables for Functionality Freeze Milestone Checklist Template

VF-C Dublin: Deliverables for RC0 Milestone Checklist Template


DEPRECATED: Sonar warning (46%) on 

vfc-nfvo-driver-vnfm-svnfm-nokia-vnfmdriver

Note:the vfc-nfvo-driver-vnfm-svnfm-nokia-vnfmdriver code will deprecated and no longer maintained, because we have upgraded nokia vnfm driver to v2 version and you will see the new version code coverage is 84.1%
VF-C Dublin: Deliverables for RC1 Milestone Checklist Template

VF-C Dublin: Deliverables for RC2 Milestone Checklist Template


VF-C Dublin: Deliverables for Release Sign-Off Milestone Checklist Template
27VID projectDec 4, 2018

VID R4 M1 Release Planning

VID R4 M1 Deliverables for Planning Milestone Checklist

VID R4 M2 Deliverables for Functionality Freeze Milestone Checklist

VID R4 M3 Deliverables for API Freeze Milestone Checklist

Missing swagger API info

In -process Integration blockers:

Jira
serverONAP JIRA
serverId425b2b0a-557c-3c0c-b515-579789cceedb
keyVID-429

Jira
serverONAP JIRA
serverId425b2b0a-557c-3c0c-b515-579789cceedb
key

VID-443

VID R4 M4 Deliverable for Code Freeze Milestone Checklist

Outstanding level 8 vulnerability threats with no action plans => dependency on Portal

VID-443


VID R4 M4 Deliverable for Code Freeze Milestone Checklist


VID R4 RC0 Milestone Checklist

VID R4 RC1 Milestone Checklist




VID R4 RC2 Milestone Checklist

28VNF SDKDec 2, 2018

VNF SDK Dublin Release Planning (M1)

VNF SDK Deliverables for Planning Milestone Checklist Template(M1)

VNFSDK Dublin M2 Deliverables for Functionality Freeze Checklist

Conditional:

Unit test coverage by M3

VNF SDK Dublin API Freeze(M3)

Unit test coverage low: VNFSDK refrepo: 52.3% now is 55.3%




VNF SDK Dublin Code Freeze (M4)

Open "high/highest" defect


Dublin VNFSDK RC0 Checklist - Release Candidate 0 MilestoneDublin VNFSDK RC1 Checklist - Release Candidate 1 MilestoneDublin VNFSDK RC2 Checklist - Release Candidate 2 Milestone
Sonar goal not met: vnfsdk-dovetail-integration


29VNF RequirementsNov 16, 2018

Dublin Release Plan for VNFRQTS

M1 Deliverables for Planning Milestone Checklist Template

M2 Deliverables for Functionality Freeze Milestone Checklist VNFRQTSM3 Deliverables for API Freeze Milestone ChecklistM4 Deliverable for Code Freeze Milestone Checklist VNFRQTS

RC0 Milestone Checklist Template - VNFRQTS



RC1 Milestone - Checklist VNFRQTSRC2 Milestone checklist VNFRQTSsignoff checklist
30VNF Validation (VVP)Nov 16, 2018

Dublin Release Plan for VVP

M1 Deliverables for Planning Milestone Checklist Template 

M2 Deliverables for Functionality Freeze Milestone Checklist Template


M3 Deliverables for API Freeze Milestone Checklist TemplateM4 Code Freeze Milestone Checklist Template for VVP

RC0 Milestone Checklist - VVP


RC1 Milestone Checklist -VVPRC2 Milestone checklist VVPSignoff