Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

View file
name2019-10-09 ONAP_5G_Bulk_PM_Control.pptx
height250

Secure 5G Bulk PM:

View file
name2019-09-24 ONAP_Secure_Communication_Bulk_PM_R6.pptx
height250


Previous Release

5G Bulk PM use case in R4: 5G - Bulk PM (Casablanca carry-over items)

...

  1. jira
    Jira
    serverONAP JIRA
    columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
    serverId425b2b0a-557c-3c0c-b515-579789cceedb
    keyREQ-129
    serverONAP JIRA
    serverId425b2b0a-557c-3c0c-b515-579789cceedb
    keyREQ-136

Project Impact

425b2b0a-557c-3c0c-b515-579789cceedb

PROJECTPTLUser Story / EpicRequirement
A&AIEpic #1 PM control

Currently no impact on AAI project expected based on the following assumptions:

  • PNF and VNF inventory models already contain status attribute that can indicate when a new instance has been fully instantiated
    • orchestration-status is main candidate
    • At least for PNFs it is expected that the SO workflow must be updated to set this attribute
  • AAI will send topology event on AAI-EVENT topic when status attributes are updated
AAF

Jonathan Gathman 

Epic #2 Secure 5G Bulk PM

Functionality will be developed in separate release requirement

Jira
serverONAP JIRA
serverId
keyREQ-140
  • CMPv2 Client implementation so that ONAP platform components can get operator certificates.
  • Ensure AAF provides interface allowing DCAE to deploy extra client certificate for external communication



APPC


CLAMPEpic #1 PM control

Assumptions

  • Current analysis indicates that CLAMP has support for model-driven UI to parametrize the configuration policy for the new PMSH mS. This basic functionality could be enhanced in later step.
  • Both VNFs and PNFs can be supported
CC-SDK

DCAE

Epic #1 PM control

Jira
serverONAP JIRA
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
serverId425b2b0a-557c-3c0c-b515-579789cceedb
keyDCAEGEN2-1820

Jira
serverONAP JIRA
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
serverId425b2b0a-557c-3c0c-b515-579789cceedb
keyDCAEGEN2-1821

Epic #2 Secure 5G Bulk PM

Jira
serverId
serverONAP JIRA
425b2b0a-557c-3c0c-b515-579789cceedb
keyDCAEGEN2-1795




  • Addition of new PMSH micro-service supporting
    • Configuration policy to provide PM subscription parameters
    • Sending closed loop event to trigger operational policy for xNF PM configuration
    • Interaction with AAI to discover xNF instances and fetch needed information
    • (Stretch goal) DMaaP or similar interface to request activation/de-activation of subscription
  • (Stretch goal) Optional capability to forward subscription data like measurement list to PM Mapper using appropriate mechanism (to be further discussed)

-------

Another enhancement

  • CMPv2 for operator certificate enrollment for secure 5G Bulk PM. 

DMaaP



External API

MODELING

Multi-VIM /

Cloud



OOFShankaranarayanan Puzhavakath Narayanan

POLICY

Epic #1 PM control

Functionality will be developed in separate release requirement

Jira
serverONAP JIRA
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
serverId425b2b0a-557c-3c0c-b515-579789cceedb
keyREQ-33

  • Support APEX operational policy in combination with CDS actor
PORTAL

SDN-C

SDC

SO

Epic #1 PM control

Jira
serverONAP JIRA
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
serverId425b2b0a-557c-3c0c-b515-579789cceedb
keySO-2399

  • Workflow shall update status attribute in AAI when the VNF/PNF instance has been fully instantiated
    • orchestration-status is main candidate
    • At least for PNFs it is expected that the SO workflow must be updated to set this attribute (Jira issue defined)
VID

VNFRQTS

VNF-SDK

CDS

Integration

Epic #1 PM control

Jira
serverONAP JIRA
serverId425b2b0a-557c-3c0c-b515-579789cceedb
keyINT-1312

  • PM control e2e test case
  • New/updated xNF simulator with demo YANG model for PM control
  • Test artifacts:
    • CBA implementing new controller actions with transformation from xNF-agnostic subscription to xNF-specific YANG model
    • APEX operational policy to forward subscription configuration from PMSH to controller using the CDS Actor

List of PTLs:Approved Projects

Test Status


DEMOS

DemoFile / Recording

 

Plugfest ORAN ONAP Bulk PM Demo

Prerecorded Demo Nokia

View file
name5G_Bulk_PM_Nokia_Dec_2019.mp4
height250

 

Plugfest ORAN ONAP Bulk PM Demo

Prerecorded Demo Ericsson


Slides for Plugfest ORAN ONAP Bulk PM Oskar Malm

View file
nameOSC_A_Plugfest_Bulk_PM.pptx
height250