Business Drivers

See the Performance Measurements Use Cases Wiki for the business driver description: PERFORMANCE MEASUREMENTS USE CASES: Bulk, RT, Dictionary



Frankfurt Scope

PM control:


Previous Release

5G Bulk PM use case in R4: 5G - Bulk PM (Casablanca carry-over items)

Epics

  1. REQ-129 - Getting issue details... STATUS

Project Impact

PROJECTPTLUser Story / EpicRequirement
A&AIEpic #1 PM control

Currently no impact on AAI project expected based on the following assumptions:

  • PNF and VNF inventory models already contain status attribute that can indicate when a new instance has been fully instantiated
    • orchestration-status is main candidate
    • At least for PNFs it is expected that the SO workflow must be updated to set this attribute
  • AAI will send topology event on AAI-EVENT topic when status attributes are updated
AAF



APPC


CLAMPEpic #1 PM control

Assumptions

  • Current analysis indicates that CLAMP has support for model-driven UI to parametrize the configuration policy for the new PMSH mS. This basic functionality could be enhanced in later step.
  • Both VNFs and PNFs can be supported
CC-SDK

DCAE

Epic #1 PM control

DCAEGEN2-1820 - Getting issue details... STATUS

DCAEGEN2-1821 - Getting issue details... STATUS




  • Addition of new PMSH micro-service supporting
    • Configuration policy to provide PM subscription parameters
    • Sending closed loop event to trigger operational policy for xNF PM configuration
    • Interaction with AAI to discover xNF instances and fetch needed information
    • (Stretch goal) DMaaP or similar interface to request activation/de-activation of subscription
  • (Stretch goal) Optional capability to forward subscription data like measurement list to PM Mapper using appropriate mechanism (to be further discussed

DMaaP



External API

MODELING

Multi-VIM /

Cloud



OOFShankaranarayanan Puzhavakath Narayanan

POLICY

Epic #1 PM control

Functionality will be developed in separate release requirement

REQ-33 - Getting issue details... STATUS

  • Support APEX operational policy in combination with CDS actor
PORTAL

SDN-C

SDC

SO

Epic #1 PM control

SO-2399 - Getting issue details... STATUS

  • Workflow shall update status attribute in AAI when the VNF/PNF instance has been fully instantiated
    • orchestration-status is main candidate
    • At least for PNFs it is expected that the SO workflow must be updated to set this attribute (Jira issue defined)
VID

VNFRQTS

VNF-SDK

CDS

Integration

Epic #1 PM control

INT-1312 - Getting issue details... STATUS

  • PM control e2e test case
  • New/updated xNF simulator with demo YANG model for PM control
  • Test artifacts:
    • CBA implementing new controller actions with transformation from xNF-agnostic subscription to xNF-specific YANG model
    • APEX operational policy to forward subscription configuration from PMSH to controller using the CDS Actor

List of PTLs:Approved Projects

Test Status


DEMOS

DemoFile / Recording

 

Plugfest ORAN ONAP Bulk PM Demo

Prerecorded Demo Nokia

 

Plugfest ORAN ONAP Bulk PM Demo

Prerecorded Demo Ericsson


Slides for Plugfest ORAN ONAP Bulk PM Oskar Malm

  • No labels