Date  

Meeting Logistics

DayTimeMeeting IDZoom LinkJoin by phone
Monday[sdc] Team ONAP3, Mon UTC 11:00 / China 19:00 / Eastern 06:00 / Pacific 03:00https://lists.onap.org/g/onap-meetings/calendarSee Groups.io calendar invite

See Groups.io Calendar Invite

Note that a Waiting room has been added to the meeting room, the host will let you join once identified

Meeting Attendees

Anderson Ribeiro

André Schmid 

David Sadlier 

Vasyl Razinkov 

Xue Gao 

rajesh kumar 

Bhagyalakshmi R 

Stasys Jurgaitis 

Agenda & Minutes

Review open action items from last week

AgendaMinutes (Draft to be updated during call)
Slides

High Priority Bugs


High priority defects :

 

T Key Summary Assignee Reporter P Status Resolution Created Updated Due
Loading...
Refresh


Open review
Istanbul release

Istanbul release planning schedule here: Release Planning: Istanbul

M3 (functional code freeze) on August 26th.

All JIRA issues with 'High' or 'Highest' priority need to be resolved

 

Inactive old issues with 'High' or 'Highest' priority to be reduced in priority. If anybody feels any of these issues should be kept as high or highest priority then please raise a discussion on it

Code coverage at 55.6 %

 

Some 'High' or 'Highest' priority issues resolved since last week. The following issues that will be reduced in priority: SDC-2716 - Getting issue details... STATUS , SDC-2325 - Getting issue details... STATUS SDC-1488 - Getting issue details... STATUS . If anybody feels any of these issues should be kept as high or highest priority then please raise a discussion on it.

Code coverage at 55.5 %

 

M3 postponed to Thursday 2nd Sept

No change in rest of the rest of the release schedule

 

M3 passed last Thursday 2nd Sept, no more functional content accepted in Istanbul

 

M4 planned for this Thursday 16th Sept. Releasing the docker images delayed by failure in https://jenkins.onap.org/view/docker/job/sdc-maven-docker-stage-master/, need to update version of maven from 3.5 to 3.6

 

M4 passed by TSC last Thursday.

Issue seen in gating with importing VSPs using backend REST API. Fix implemented, to be released to gating

 

Gating results look good with latest release 1.9.3


SDC performance issue

During H release Stability testing for SDC, it was noticed that performance decreases over time, up to the point where onboarding is not successful

Not had time to investigate logs yet but saw some exceptions happening

Test details and logs can be found here :

INT-1912 - Getting issue details... STATUS

 

Cassandra configuration changes in stability tests resulted in significant improvement with success rate in excess of 90%. Remaining failures are likely to be due to timing issues

Duration per request increases as DB becomes more loaded. 

Patchset to be pushed with new configuration and to expose configuration through helm charts to enable tunning where required.

Test results: https://logs.onap.org/onap-integration/weekly/onap_weekly_pod4_master/2021-06/28_21-34/stability/results_sdc_5_24h/onaptests_bench.html

 

Review push for exposing the configuration 

https://gerrit.onap.org/r/c/sdc/+/122516

  

SDC changed merged. OOM change in progress

 

OOM change pushed, waiting on SDC release 

 

SDC release to be done at M3 on Thursday

 

M3 postponed last week so release not done, plan to release at M3 this Thursday instead, but if needed earlier let PTL know

 

Release to be done when issue observed in deploying is resolved


Intermittent distribution failures in Gating

Intermittent failures in distribution causing Gating to fail. Was previously investigated, what is the current status?


Following issue reported during onboarding which can lead to distribution failures but the issue is in the onboarding: 

SDC-3508 - Getting issue details... STATUS

Suspected to be caused by consistency issue between cassandra nodes. Changes to consistent settings in cassandra has been suggested by Orange that may resolve this issue

 

Priority likely to be lowered, failures due to concurrent requests to cassandra 


Jakarta Release timeplan

Milestone date approved by TSC:

Release Planning: Jakarta


Q&A

If you have time, pay attention to SDC mailing list and Slack channel questions


Two issues raised by Bhagya:

  • Issue onboarding VNF with multiple instances in topology
  • Support needed to create SDC users

Jira issues to be created and team will provide support



Action Items

  •  


Slack Channel: #SDC on LFN ONAP.org Slack instance (onapproject.slack.com)


Recording

zoom_0.mp4

Chat