You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 3 Next »

Test Lab:

Legend:

NOT STARTED IN PROGRESS DEFERRED COMPLETED

JIRA:

Closed loop for network slicing integration test

S. No

Test Case

Description

Priority

Dependency/Issue

Tester

Status

Remarks

Test Details

1

Generate PM data

Generate closed-loop  PM data in Ransim, store the XML files in VM and send VES notification


Niranjana Y NOT STARTED




2

Generate PM data

DataFileCollector reads the VES notification, fetches the PM xml file from the VM (using SFTP) and posts it in data router


Niranjana Y 

NOT STARTED



3

Generate PM data

PM Mapper reads the PM file from data router, generates PM events and posts the data in the message router(uses unauthenticated topic)


Niranjana Y 

NOT STARTED



4Closed LoopSlice Analysis MS reads the message from message router(uses unauthenticated topic) and triggers Control Loop(uses CPS and AAI to fetch relevant data) action towards Policy for throughput update 


Niranjana Y 

NOT STARTED

Prerequisite:

  1. Data should be loaded in CPS
  2. TBDMT templates should be preloaded




5Closed LoopUpon reception of CL action from Slice Analysis MS, Policy triggers SO (RAN NSSMF) for reconfiguration of RAN resources.


Niranjana Y 

NOT STARTED



6Closed LoopUpon CL trigger from Policy, SO (RAN NSSMF) triggers SDN-R for updating the throughput per Near-RT RIC.


NOT STARTED



7Closed LoopUpon receiving the reconfiguration trigger from SO, SDN-R(uses CPS to fetch relevant data) sends the config updates to RAN-Sim.


NOT STARTED

Prerequisite:

  1. Data should be loaded in CPS
  2. TBDMT templates should be preloaded

8ReconfigureRAN-Sim updates DB and netconf servers.


NOT STARTED



  • No labels