Agenda

    • Status and Stucks
    • Technical Discussion
    • Making the PTL Happy

Notes

    • Status and Stucks
      • Current POMBA Casablanca Stories (Logging Project)

      • Current Code Inspections

      • We will start moving Stories to Dublin that we don't think will make the code cutoff date
      • Data router and search data service, a&AI context builder and validation service decomposer are merged
        • OOM (yes)
        • Regular code (yes)
        • Stories will be closed shortly
          • Note we can track some left over bits as bugs as appropriate and close stories.
      • All seed code except (SDNC and enricher) are now in!
      • Right now someone should be able to download in ONAP repo and run an audit
      • We can now send out an email telling people how to do it. Let's ensure we have reasonable instructions though.
        • Note they will have disclaimers.
        • Once below bug is fixed
      • Note there is an A&AI context builder bug
        • This will block successful execution
        • Fixing this should be a priority
        • Note there was another bug, that has been fixed and checked in.
      • We do have an ONAP open lab setup of POMBA + real components its needs. This enables end to end testing with vFW.
    • Technical Discussion
      • We will demo the updated APIs and rules when available.
        • Network Discovery demo
          • Perhaps in SDNC weekly as a standalone piece as well.
      • SDNC Context Builder
        • Requires extra work, in particular as the prototype needs to be modified to use the generic resources API.
        • It would be interesting for folks though, from a reporting perspective.
    • Making the PTL Happy
      • M3 passed last week (I think)
      • Code freeze is Sept 20
        • After this date, the focus is more bug fixes.
      • Note that we have a sonar bug reported for the data router, we have the fix in review.