You are viewing an old version of this page. View the current version.

Compare with Current View Page History

Version 1 Next »


Showcase VNFTest EnvironmentIntegration Team Liaison





Development Status

ProjectPTLJIRA Epic / User Story*Requirements
AAI

TBD.

DCAEVijay Venkatesh Kumar
  1. DCAE should onboard PCI Handler Microservice
  2. Collector should accept FM/PM message from RAN Simulator and publish to DMaaP
 OOF
  1. OOF PCI Algorithm should support different optimization objectives (e.g. minimize changes, minimize confusion)
 Policy


  1. Policy module should support handling of partial success where only some of the PCI change actions from a set of changes are successful (e.g. allow partial changes, revert to previous state)
 SDC
  1. PCI Handler Microservice should be added to SDC Catalog to support DCAE onboarding
 SDNC

(Carryover items from Dublin)

-SDNC-430: Modify RAN informational model and yang model for RAN
-SDNC-431: Implement config DB and REST API (SDN-R / OOF interface)
-SDNC-432: Interfacing SDN-R with Policy
•Receive DMaaP message in CL format from Policy (Modify Config message using existing LCM API), send netconf message changing PCI value to cellID as specified, update config DB, and publish change on DMaaP (DMaaP client is available and can be called)
-SDNC-432: Receive netconf notification from RAN, update configDB, and publish change on DMaaP

  1. SDNC-430: Modify RAN informational model and yang model for RAN
  2. -SDNC-431: Implement config DB and REST API (SDN-R / OOF interface)
  3. -SDNC-432: Interfacing SDN-R with Policy - Receive DMaaP message in CL format from Policy (Modify Config message using existing LCM API), send netconf message changing PCI value to cellID as specified, update config DB, and publish change on DMaaP (DMaaP client is available and can be called)
  4. SDNC-432: Receive netconf notification from RAN, update configDB, and publish change on DMaaP
  5. SDNC should maintain an operational database and configuration database. May be a modification of SDNC-431.

*Each Requirement should be tracked by its own User Story in JIRA 

Testing

Current Status

  1. Testing Blockers

  2. High visibility bugs
  3. Other issues for testing that should be seen at a summary level
  4. Where possible, always include JIRA links


End to End flow to be Tested

**This should be a summary level Sequence diagram done in Gliffy** 

Summary SeqDia Template

Test Cases and Status


#Test CaseStatus
1There should be a test case for each item in the sequence diagram

NOT YET TESTED

2create additional requirements as needed for each discreet step

COMPLETE

3Test cases should cover entire Use Case

PARTIALLY COMPLETE

Test Cases should include enough detail for testing team to implement the test

 FAILED

  • No labels