You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 3 Next »



Overview

Project NameEnter the name of the project
Target Release NameIstanbul
Project Lifecycle StateMature
Participating Company AT&T, Ericsson, Bell Canada

Scope

Planned Updates

  • Make policy-clamp official
  • Make TOSCA Control Loop official
  • Multi-cluster support
  • Only send policy deltas to PDPs
  • Allow rules to specify EventManagerService
  • DB Enhancements
  • Unify the representation of control loops in CLAMP
  • Update control loop TOSCA to support design-time and runtime roles
  • APEX-PDP enhancements
    • SSL support in Kafka IO plugin
    • Send notifications to DMaaP/Kafka
    • Context album improvements
    • Mount truststore via helm charts
  • Add more flexible time and dayOfWeek capabilities in xacml-pdp
  • Store audit details of policy deploy/undeploy in PAP
  • Enhance consolidated health check to include dependencies (e.g., DMaaP connectivity)
  • Usual sonar/code coverage improvements
  • Archive policy-engine repo and change its status to “unmaintained”

Requirements

Please see the release requirements planned as identified in Policy Istanbul-R9 Architecture Review

Minimum Viable Product

The following application components are the MVP from this release.

  • Policy Lifecycle API component
  • Policy Administration Point component
  • PDP-A - Apex PDP Engine
  • PDP-D - Drools PDP Engine
  • PDP-X - XACML PDP Engine
  • Policy Distribution Component

Functionalities

List the functionalities that this release is committing to deliver by providing a link to JIRA Epics and Stories. In the JIRA Priority field, specify the priority (either High, Medium, Low). The priority will be used in case de-scoping is required. Don't assign High priority to all functionalities.

Epics

Key Summary T Created Updated Due Assignee Reporter P Status Resolution
Loading...
Refresh

Stories

Key Summary T Created Updated Due Assignee Reporter P Status Resolution
Loading...
Refresh


Longer term roadmap

Indicate at a high level the longer term roadmap. This is to put things into the big perspective.

Release Deliverables

Indicate the outcome (Executable, Source Code, Library, API description, Tool, Documentation, Release Note, etc) of this release.

Deliverable NameDeliverable Description
Policy Drools PDPExecutable - supports Tosca Policies execution in the Drools PDP
MariaDB

SQL database

  • Stores policies and their versions
  • Stores templates/models and their versions
  • Stores PDP grouping information
  • Stores PDP-Policy deployment status
  • Stores Policy component statistics
  • Stores Policy audit details
  • Stores Policy distribution details
  • Operational History database
Policy SDC Distribution IntegrationExecutable - receives SDC Service Distribution notifications and translates VNF/Service policies into runtime policies.
Policy Apex PDPExecutable - supports Tosca Policies execution in the Apex PDP
Policy Lifecycle APIExecutable - supports the provisioning of Tosca Policies
Policy PAPExecutable - supports the administration of policies to PDPs at runtime
Policy XACML PDPExecutable - supports Tosca Policies execution in the XACML PDP
Policy CLAMPExecutable(s) - supports Policy creation via a GUI and TOSCA Control Loops

Sub-Components

See the table above for the Policy subcomponents.  

Architecture

High level architecture diagram

ARC Policy Framework Component Description - Istanbul-R9

https://docs.onap.org/projects/onap-policy-parent/en/latest/architecture/architecture.html

Platform Maturity

Please see Istanbul Release Platform Maturity


  • API Incoming Dependencies

List the API this project is expecting from other projects.
Prior to Release Planning review, Team Leads must agreed on the date by which the API will be fully defined. The API Delivery date must not be later than the release API Freeze date.

Prior to the delivery date, it is a good practice to organize an API review with the API consumers.

API NameAPI DescriptionAPI Definition DateAPI Delivery dateAPI Definition link (i.e.swagger)
AAFAuthentication

We are not expecting any upgrades for any of our requirements.

M3
DmaapMessage Router

We are not expecting any upgrades for any of our requirements.

M3
SDCService Distribution

We are not expecting any upgrades for any of our requirements.

DMaaP

M3
AAI

Schema for custom query calls

We are not expecting any upgrades for any of our requirements.

REST

M3
SOVF Module Create

We are not expecting any upgrades for any of our requirements.

REST

M3
SDNRSDN-R component interface

We are not expecting any upgrades for any of our requirements.

Dmaap - No direct link to any libraries

M3
SDNCSDN-C component interface

We are not expecting any upgrades for any of our requirements.

Dmaap - No direct link to any libraries

M3
VFCVFC component interface

We are not expecting any upgrades for any of our requirements.

REST

M3
CDSCDS component Interface

Upgrading to new CDS jars

M3
  • API Outgoing Dependencies

API this project is delivering to other projects.

API NameAPI DescriptionAPI Definition DateAPI Delivery dateAPI Definition link (i.e.swagger)
Policy Lifecycle APICRUD for Policy Types and PoliciesM3M3https://docs.onap.org/projects/onap-policy-parent/en/latest/api/api.html
PAP API

PDP Group API and Deploy/Undeploy of Policies

Health Check

Policy Deployment Status

PDP-Policy Deployment Status

M3M3https://docs.onap.org/projects/onap-policy-parent/en/latest/pap/pap.html
Decision APIClient API for ONAP components to ask for Decision as to which policy they should enforce for a set of given attributes.M3M3https://docs.onap.org/projects/onap-policy-parent/en/latest/xacml/decision-api.html
  • Third Party Products Dependencies



DescriptionVersion
MariaDBThe MariaDB is the repository that holds all the policies, templates, PDP group, and deployment information.

10.5.8

OpenJDKOpenJDK for Alpine from integration images (integration/docker/onap-java11 repository)
openjdk11:jre-11.0.11_9-alpine


  • Testing and Integration Plans

The testing and integration activities are described in the following page: Policy R9 Istanbul CSIT/External Lab Functional Test Cases

  • Gaps

This section is used to document a limitation on a functionality or platform support. We are currently aware of this limitation and it will be delivered in a future Release.
List identified release gaps (if any), and its impact.

Gaps identifiedImpact
To fill outTo fill out
  • Known Defects and Issues

Please refer to Frankfurt Defect Status


  • Risks

List the risks identified for this release along with the plan to prevent the risk to occur (mitigation) and the plan of action in the case the risk would materialized (contingency).

Please update any risk on the centralized wiki page - Frankfurt Risks

  • Resources

Fill out the Resources Committed to the Release centralized page.

  • Release Milestone

The milestones are defined at the Release Level and all the supporting project agreed to comply with these dates.

  • Team Internal Milestone

This section is optional and may be used to document internal milestones within a project team or multiple project teams. For instance, in the case the team has made agreement with other team to deliver some artifacts on a certain date that are not in the release milestone, it is erecommended to provide these agreements and dates in this section.

It is not expected to have a detailed project plan.

DateProjectDeliverable
To fill outTo fill outTo fill out
  • Documentation, Training

Please update the following centralized wiki: Frankfurt Documentation

That includes

  • Team contributions to the specific document related to he project (Config guide, installation guide...).
  • Team contributions to the overall Release Documentation and training asset
  • High level list of documentation, training and tutorials necessary to understand the release capabilities, configuration and operation.
  • Documentation includes items such as:
    • Installation instructions
    • Configuration instructions
    • Developer guide
    • End User guide
    • Admin guide
    • ...

Note

The Documentation project will provide the Documentation Tool Chain to edit, configure, store and publish all Documentation asset.


Other Information

  • Vendor Neutral

If this project is coming from an existing proprietary codebase, ensure that all proprietary trademarks, logos, product names, etc. have been removed. All ONAP deliverables must comply with this rule and be agnostic of any proprietary symbols.

  • Free and Open Source Software

FOSS activities are critical to the delivery of the whole ONAP initiative. The information may not be fully available at Release Planning, however to avoid late refactoring, it is critical to accomplish this task as early as possible.
List all third party Free and Open Source Software used within the release and provide License type (BSD, MIT, Apache, GNU GPL,... ).
In the case non Apache License are found inform immediately the TSC and the Release Manager and document your reasoning on why you believe we can use a non Apache version 2 license.

Each project must edit its project table available at Project FOSS.


Charter Compliance

The project team comply with the ONAP Charter.

  • No labels