You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 18 Next »

Business Drivers

See the Performance Measurements Use Cases Wiki for the business driver description: PERFORMANCE MEASUREMENTS USE CASES: Bulk, RT, Dictionary

Frankfurt Scope

PM control:


Secure 5G Bulk PM:

Previous Release

5G Bulk PM use case in R4: 5G - Bulk PM (Casablanca carry-over items)

Epics

REQ-129 - Getting issue details... STATUS

REQ-136 - Getting issue details... STATUS

Project Impact

Note: Architecture discussions as well as prototyping is still ongoing, which could result in some changes to described project impact.

PROJECTPTLUser Story / EpicRequirement
A&AI

James Forsyth  REQ129


  • Generic support for event generation is available by AAI.
  • Ensure PNF model in AAI contains proper attributes indicating its status.
AAF

Epic #2 Secure 5G Bulk PM

Functionality will be developed in separate release requirement

REQ-140 - Getting issue details... STATUS

  • CMPv2 Client implementation so that ONAP platform components can get operator certificates.
  • Ensure AAF provides interface allowing DCAE to deploy extra client certificate for external communication
APPC


CLAMP
  • Ensure CLAMP can support
    • PNFs in Control Loops (TBD)
  • Current analysis assumes that it is possible to reuse current CLAMP UI to parametrize the configuration policy for the new PMSH mS
CC-SDK

DCAE

Epic #1 PM control













Epic #2 Secure 5G Bulk PM

  • Addition of new PMSH micro-service (open a DCAE JIRA TICKET)
  • Any needed updates to PM Mapper mS to enable dynamic mapping of measurements that are part of active subscriptions (stretch goal, open a Jira ticket with low priority)

-------

Another enhancement

  • CMPv2 for operator certificate enrollment for secure 5G Bulk PM. 

DMaaP



External API

MODELING

Multi-VIM /

Cloud



OOFShankaranarayanan Puzhavakath Narayanan

POLICY


  • Policy to support
    • CDS Actor in operational policy. (dependency on REQ-33)
    • The intent is to use CDS with APEX policy (TBD)
PORTAL

SDN-C

SDC

SO
  • Update AAI when the PNF has been fully instantiated (open a JIRA TICKET)
VID

VNFRQTS

VNF-SDK

CDS

Integration
Epic #1 PM control
  • PM control e2e test case (open a JIRA TICKET)
  • New/updated xNF simulator with demo YANG model for PM control
  • Test artifacts:
    • CBA implementing new controller actions with transformation from xNF-agnostic subscription to xNF-specific YANG model
    • Operational policy to forward subscription configuration from PMSH to controller using the CDS Actor

List of PTLs:Approved Projects

Test Status

  • No labels