USE CASE KEY INFORMATION
USE CASE | LEAD CONTACTS / DESCRIPTION | WIKI |
PNF Plug and Play | 5G - PNF Plug and Play | |
Integration Leads | ||
Requirement ID | Jira for the requirement | |
Architecture Sub-committee Jira tracker | Architecture sub-committee presentation | |
Model Place / Geolocation / AAI Schema Meetings Register | PNFD/SDC AID/AAI Schema Modeling/5G Svc Model - R7 Discussion |
BUSINESS DRIVER
This section describes Business Drivers needs.
EXECUTIVE SUMMARY - This requirement will augment the work-flow to building block management within SO for Plug and Play operation. The continues the work started in R6. In R6, some of the SO work-flow to building block work was finished, and in R7 this is enhanced. The description of the "base" work which will be enhanced is shown in the wiki: PNF PLUG and PLAY in R6 Frankfurt
BUSINESS IMPACT - The enhancement to Plug and Play operation in ONAP is a critical business function because they enhance installation and commissioning activities.
BUSINESS MARKETS - This project applies to any domain (wireless, transport, optical, and wireline) that ONAP may manage.
FUNDING/FINANCIAL IMPACTS - The plug and play project has Operating Expense (OPEX) savings for operators because of the ability to saving time and expenses during installation and commissioning and contributes towards ZTM (Zero touch management).
ORGANIZATION MGMT, SALES STRATEGIES - There is no additional organizational management or sales strategies for this use case outside of a service providers "normal" ONAP deployment and its attendant organizational resources from a service provider.
DEVELOPMENT STATUS
PROJECT | PTL | User Story / Epic | Requirement |
A&AI | NO IMPACT | ||
AAF | EPIC #1 (Integration) CMPv2 - Enhanced Secure X.509 Certificate support | ||
APPC | NO IMPACT | ||
CLAMP | NO IMPACT | ||
CC-SDK | NO IMPACT | ||
DCAE | NO IMPACT | ||
DMaaP | NO IMPACT | ||
External API | NO IMPACT | ||
MODELING | NO IMPACT | ||
Multi-VIM / Cloud | NO IMPACT | ||
OOF | NO IMPACT | ||
POLICY | NO IMPACT | ||
PORTAL | NO IMPACT | ||
SDN-C | EPIC #3 Licensing Management flow w.r.t. PnP (q.v. Licensing Management Use Case) | ||
SDC | NO IMPACT | ||
SO | EPIC #2 Workflow to Building Block Development and integration | ||
VID | NO IMPACT | ||
VNFRQTS | NO IMPACT | ||
VNF-SDK | NO IMPACT | ||
CDS | NO IMPACT |
List of PTLs:Approved Projects
*Each Requirement should be tracked by its own User Story in JIRA
USE CASE DIAGRAM
Use cases define how different users interact with a system under design. Each use case represents an action that may be performed by a user (defined in UML as an Actor with a user persona).
USE CASE FUNCTIONAL DEFINITIONS
Use Case Title | PNF Plug and Play |
Actors (and System Components) | PNF (5G DU) ONAP DCAE-VES Event Listener |
Description | PNF Plug and Play is used for installation and commissioning when a PNF registers with ONAP |
Points of Contact | |
Preconditions | A list of conditions that are assumed to be true before the Use Case is invoked Includes description of Information Consumed |
Triggers / Begins when | Describes the trigger for beginning the Use Case |
Steps / Flows (success) | Describes the sequence of steps and interactions that occur during the Use Case (may include: description, data exchanges, functionality, state changes) Interaction diagrams may be included or referenced |
Post-conditions | The expected results of the execution of the Use Case Includes description of Information Produced |
Alternate / Exception Paths | Description of any exceptions or special process that could occur during Use Case |
Related Use Cases | List of the Use Cases referenced by this Use Case |
Assumptions | Describes any assumptions that are made for this use case |
Tools / References / Artifacts | List of any tools or reference material associated with this Use Case as well as any JIRA trace-ability. List of any associated diagrams or modelling artifacts associated with the Use Case |
SUPPORTING FILES
Topic | File |
---|---|
Place / Geolocation Parameters & Analysis | |
ETSI SOL001 proposal - Geolocation Update | |
TESTING
Current Status
Testing Blockers
- High visibility bugs
- Other issues for testing that should be seen at a summary level
- Where possible, always include JIRA links
END TO END FLOW TO BE TESTED
MEETING LOG
Regular meetings for PNFD/SDC AID/A&AI Schema Moeling and 5G Service Modeling
discussion for Geolocation & Place development for using using Plug and Play.
See this wiki for the Meetings: PNFD/SDC AID/AAI Schema Modeling/5G Svc Model - R7 Discussion
you can watch/listen to previous recordings and meeting at the R6 PnP page: PNF PLUG and PLAY in R6 Frankfurt
TEST CASES AND STATUS
1 | There should be a test case for each item in the sequence diagram | NOT YET TESTED |
2 | create additional requirements as needed for each discreet step | COMPLETE |
3 | Test cases should cover entire Use Case | PARTIALLY COMPLETE |
4 | Test Cases should include enough detail for testing team to implement the test | FAILED |