Date

Attendees

Goals

  • Status Report
  • Sprint review
  • Discuss Design items

Discussion items

TimeItemWhoNotes
10minReview current status of CLAMP
  • Presented CLAMP Dashboard to the Team
  • Discussed on M2 checklist
40minDiscuss the Design for R1
  • A presentation was prepared by Ron to show the details of the Changes for R1, mapped to the use cases we want to support in this release
  • Still a few details to sort out/Enhancement (TCA call on Monday)
  • Looked at the flow of CLAMP (highlighted the various part of the work areas for R1 VS the existing functions in the seed code)
  • Discussed integration with VF-C and who is defining the closed loop actions, deferred to the use case group
  • Discussed the design time through the cockpit
  • Blueprint generation during onboarding (at least basic format)
  • SDC providing the blueprint & template is outside the scope of R2
  • API to policy should stay the same, but the content may differ
  • Discussed policy interations
  • blueprint for closed loops might change due to DCAE R2
  • Will the VES onboarding YAML be created by the use case team ?
  • need to define a backup plan in case it is not available (manual internal list)
  • Instantiation should already be ok with the latest seed code
  • latest seed code include 1707
  • next steps to translate JIRA task under the existing stories


Action items

  • Translate design into subtasks (Chris&Team)