ONAP Project Developer Event
May 2 - 5, 2017
AT&T Labs Research, Middletown, NJ
Note: instructions for obtaining necessary visa letters as well at hotel information may be found by clicking this link.

Zoom Conference Calls (recorded)

Rooms require a one time registration.  After registering, you will receive a confirmation email containing information about joining the meeting.

Auditorium - https://zoom.us/meeting/register/2feb6df2df884eb166858a512be5123a - Meeting Capacity 100

408.638.0968 - Meeting ID 375-831-433

Room: B1-4C01 - https://zoom.us/meeting/register/28e547b0de52bcdf7c24e00bf0acd2b8 - Meeting Capacity 50

408.638.0968 - Meeting ID 314-643-574

Room: A2-7Y06 - https://zoom.us/meeting/register/c4327474bf0957238c34be5db4a05ad8 - Meeting Capacity 50

408.638.0968 - Meeting ID 965-483-641

Room: A4-5A02 - https://zoom.us/meeting/register/0104b633322bb11fc5b9141539e44ee6 - Meeting Capacity 50

408.638.0968 - Meeting ID 902-437-787


Shuttle Schedule

Agenda

DayTime (EDT)TopicSpeakersRoom







Tuesday
May 2

9:00 am-NoonDeep Dive Topics determined by Doodle Poll
A2-7Y06
Noon-1:00 pmLunch (self-paid)
Cafeteria
1:00-1:20WelcomePhil/MazinA2-Auditorium
1:20-3:00Release 1 Use Case Review

3:00-3:30Break

3:30-4:00Architecture Principals Review and Alignment
A2-Auditorium
4:00-5:00Architecture Proposal for Release 1 Use Cases
A2-Auditorium
5:00-6:00
Alternative/Additional Proposals For Release 1
(Limited to Existing Components within ECOMP or Open-o)

A2-Auditorium
6:30-7:30

Reception/Social Hour (Provided by LF)

Urban Coalhouse Pizza & Bar Red Bank NJ
2 Bridge Ave, Red Bank, NJ 07701



7:30-9:30

Group Dinner (Provided by LF)

Urban Coalhouse Pizza & Bar Red Bank NJ
2 Bridge Ave, Red Bank, NJ 07701











Wednesday
May 3

8:30am - 9:00Welcome and Code Hygiene Review
A2-Auditorium
9:00-10:30

Close on Use Cases & Architecture

Slides presented by Yoav on End to End ONAP flow


A2-Auditorium
10:30-10:45Break



10:45-11:30

Parallel Deep Dive Session to Align with Architecture / Use Cases

MSO - Overall resource orchestration driven by service instantiate requests  Template

A2-Auditorium

Modeling - Design/run time models & tools to enable a model driven, extensible platform  Template
A2-7Y06
DCAE - Data collection and analytics performed for instantiated services, fault and performance monitoring, and control loop automation.  Template
A4-5A02
Use Case VNFs - VNF sources and platform requirements to support release 1 use cases Template
B1-4C01



11:40-12:25

Parallel Deep Dive Session to Align with Architecture / Use Cases

SDN-C/APP-C/SDN-Agent - Control frameworks for network and application functions  Template


A2-Auditorium

VNF SDK / VNF Guidelines - Interface requirements and packaging guidelines for VNFs  Template


A2-7Y06
Common Services -  Logging, security, optimization, change management, platform component run time management, etc used consistently across platform components   Template
A4-5A02
Portal/VID - User interface & role management application framework.  Example use in VID, an application to create service instances from design models  Template
B1-4C01
12:30-2:00pmBox Lunch (Provided by AT&T) & Demos
A2-7Y06



2:00-2:45

Parallel Deep Dive Session to Align with Architecture / Use Cases

VF-C - Virtual function controller  Template
A2-Auditorium
Integration - Tools and processes for CI/CD of source master and release branches Template
A2-7Y06
Policy - Dynamic rules and distributed actions.     Template
A4-5A02

Mediation/Multi-VIM - ONAP infrastructure abstraction layer(s) eg. cloud  Template


B1-4C01



2:55-3:40

Parallel Deep Dive Session to Align with Architecture / Use Cases

SDC - Service design and creation of validated models used to create service instances.   Template
A2-7Y06
Certification / On-boarding Guidelines - Process, requirements, and certification environment for VNF verification before import into SDC design and execution on ONAP.   Template    D2ICE 
A4-5A02
A&AI - Active service instances and available inventory of resources on ONAP.   Template
B1-4C01
3:40-4:00Break

4:00-4:30Read out on Deep Dive Sessions
A2-Auditorium
4:30-5:30Decide on project structure for release.
Identify teams and main contacts for each project group

A2-Auditorium
5:30pmDinner (self paid)

Thursday
May 4

8:00am - 9:00TSC Meeting
A2-Auditorium
9:00-9:30Project Proposal Kick-Off
A2-Auditorium
9:30-11:30Parallel, break out to project groups (identified Wednesday)
Write project proposals.


11:30-12:00pmRelease Plan KickoffA2-Auditorium
12:00-12:45Lunch (Self Paid)

12:45-3:15Parallel, break out to project groups
Align on next steps, do initial release planning, discuss open issues, etc

Project Proposal Kick-Off
3:15-3:30Break

3:30-4:30Small Group Readout & Closing Remarks
A2-Auditorium
Friday May 58:00am-NoonCrowd sourced meeting topics and participants (proposed in calendar below)
AT&T will provide meeting room(s)



Calendar

Click below to see the events. Make sure you register at the above link if you plan to come to any of these events!

  1. EDIT THE CALENDAR

    Customise the different types of events you'd like to manage in this calendar.

    #legIndex/#totalLegs
  2. RESTRICT THE CALENDAR

    Optionally, restrict who can view or add events to the team calendar.

    #legIndex/#totalLegs
  3. SHARE WITH YOUR TEAM

    Grab the calendar's URL and email it to your team, or paste it on a page to embed the calendar.

    #legIndex/#totalLegs
  4. ADD AN EVENT

    The calendar is ready to go! Click any day on the calendar to add an event or use the Add event button.

    #legIndex/#totalLegs
  5. SUBSCRIBE

    Subscribe to calendars using your favourite calendar client.

    #legIndex/#totalLegs



  • No labels

6 Comments

  1. On THU at 9:30-11:00 Project Proposals will be authored. Will these proposals be reviewed and approved/declined later in the agenda (or at a future date)? Will the session from 9-9:30 provide a tutorial/overview of what is expected in a properly formatted project proposal?

  2. I think project proposals need to be public for a while before they can be approved by the TSC. So I wouldn't expect any approvals during the F2F. 

  3. Oliver: Traditionally (and I think this is also true in the ONAP TSC Charter) it's a two week period for public comment between formal proposal and the TSC taking it up for creation review.

  4. Can you post the slides of Merger Architecture Proposal Overview (presented during the 3pm-5pm session on 5/2/2017)?

    1. Both proposals are posted under presentations

  5. Is it possible to merge VF-C and APP-C deep dives, that are parallel but treating the same functions?