Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

The page is intended to summarize all the requirements for Dublin Release.

These requirements have been prioritized by the TSC  to realistically fit within the Dublin Release Timeline.

The Release Scope was finalized during the M1 Release Planning milestone at the TSC on January 31st.


The Requirements extracted from SP lists of priorities for Dublin are covered either by the Use Case, the functional requirements, the non functional requirement or within a project scope of work.

  • Use Cases 
  • Functional Requirements 
  • Non Functional Requirements

TSC Prioritization (Ranking)

  • RANK #0  – Special GO - fully covered by involved companies
  • RANK #1  – GO “Must Have”
  • RANK #2 - GO “Continuity of previous releases”
  • RANK #3 – GO if PTLs are OK since the impacted applications are less “stretched” i.e. CLAMP, Policy, DCAE etc.
  • RANK #4 – NO GO – Mostly new requirements/features/projects

Use Cases 

M1 Scorecard:

  • Green: Use Case will be fully implemented and tested
  • Yellow: Use Case will be partially implemented. It is possible to identify capabilities for this use case that can be tested (phasing approach).
  • Red: Use Case can not be partially delivered, min. requirements can not be met in order to define a testing strategy.
Priority

M1

Scorecard

TSC M1 ApprovalM3 ScorecardM3 TSC ApprovalM4 ScorecardTSC M4 ApprovalUse CaseOwner(s)Projects or functional requirements impacted for DublinLink(s) to HLD/LLD if anyDependency (from/to) another project(s)

T-Shirt Size (star)

Project's Impact: Test Only (TO), Code (C)Committed (C)/ Partially Committed (P) or not (N) per impacted projectIf Partially or not Committed, what are gaps/ project (people/FTEs; HLD/LLD; etc)

Company

Engagement

Notes

1-regression

3-enhancements

Status
colourGreen

Y

Status
colourYellow
titleYELLOW

Work done but test is blocked by VID/SO blockers - integration blockers

Y

vFW

Policy/(APPC)

HPA

vFirewall Use Case Upgrade
XS

All: Test Only except Policy

APPC(TO)

Policy: Committed


Policy: Committed

AT&THPA Testing confirmed by INTEL
1

Status
colourGreen

Y

Status
colourYellow
titleYELLOW

Test blocked by VID/SO blockers - integration blockers

Y

vDNSIntegration TeamHPA


All: Test OnlyN/A - part of regression testsN/A - part of regression tests
HPA Testing confirmed by INTEL
1

Status
colourGreen

Y

Status
colourYellow
titleYELLOW

Test blocked by VID/SO blockers - integration blockers

Y

vCPE (Heat)Integration TeamHPA


All: Test OnlyN/A - part of regression testsN/A - part of regression tests
HPA Testing confirmed by INTEL
2

Status
colourGreen


Y

Status
colourYellow
titleYELLOW

CCVPN Dublin Deliverables for API Freeze Milestone Checklist

Multi-sites creation function will be partially implemented.

(Has risks on implementation of coding and testing in SDC) - integration blockers

Y

Status
colourYellow
titleYELLOW

1. Almost all the coding work in each module has been delivered. (excepts Little work in SO and UUI still in progress, will be hand over ASAP. )

2. Some remaining ending work will be done by this week. 
( partial coding work in SO and SDC are under review now).

3. No big risk for integration test. Multi-site creation function, service change function(add/delete a site), close loop bandwidth adjustment function will be tested in the integration test phase.


CCVPN Use Case (Dublin)   High priority:1, SD-WAN Multi-site to Multi-site service creation; 2, Service change: add or delete a site;3, close loop intelligent surveillance

SDC, SO, SDN-C,OOF,ExternalAPI, UUI, ESR,Modeling,MultiVIM/Cloud, VFC, Modeling, DCAE, Policy, Holmes,

Consistent ID of a cloud region

CCVPN Use Case (Dublin)
AAI: M

AAI: TO

DCAE: TO

ExtAPI: TO

Multi-VIM: Test support

Holmes: C

SDC: Partially committed based on Chinamobile/ZTE/Vodafone/Fujitsu contribution

SO: Committed based on the contributions from CMCC, ZTE and VDF for the main flows

SDN-C/CCSDK : Committed based on contributions from Huawei and ZTE

VF-C: Committed

Modeling: Committed

Usecase-UI: Committed

Holmes: Committed based on Huawei and ZTE contribution

Multi-VIM/Cloud: Committed based on VMware contribution

Policy: Committed base on Huawei contribution

ExtAPI: Committed as long as a serviceOrder is created, either for service creation or modification with full service characteristics and values. ExtAPI can not read service characteristic and service state from AAI which does not expose those informations.


Dev/Test provided by Chinamobile, Vodafone, Huawei,

ZTE, WindRiver, VMWare, Intel, Lenovo, ChinaTelecom, Fujitsu


2

Status
colourGreen

5G Use Case (Dublin)

Y

Status
colourGreen
titleGreen

5G Use Case (Dublin)


Y

Status
colourGreen

Codes delivered and ready for integration tests.

5G - PNF Pre-Onboarding / Onboarding Development Status

Status
colourGreen

VNF-SDK (stretch goal) code is still being worked. But "base" code is green.

5G: PNF

Pre-onboarding

Onboarding

SDC, VNFSDK, VNFRQTS (Docs)5G - PNF Pre-Onboarding & OnboardingBBSL

SDC: C

VNFSDK: C

SDC: Committed based on Ericsson contribution

VNFSDK: Committed based on Nokia contribution

VNFRQTS: Committed based on Ericsson contribution


AT&T, Huawei, Ericsson, NokiaPNF POB/OB U/C is now in development, requirements and architecture stage with high corporate commitment.
2

Status
colourGreen

5G Use Case (Dublin)

Y

Status
colourGreen
titleGreen

5G Use Case (Dublin)

Y

Status
colourGreen

Code is delivered
5G: Bulk PMDCAE, DMaaP, VNFRqmt5G - Bulk PM (Casablanca carry-over items)5G: PM Dictionary

DCAE: C

DMaaP: C


DCAE: Committed based on Ericsson contribution

DMaaP: Committed


AT&T, Ericsson, NokiaBulk PM is in development with high corporate commitment.
2

Status
colourGreen

5G Use Case (Dublin)

Y

Status
colourGreen

5G Use Case (Dublin)

Y

Status
colourYellow

Functionality delivered in all impacted projects, except one open issue in SO:

Jira
serverONAP JIRA
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
serverId425b2b0a-557c-3c0c-b515-579789cceedb
keySO-1779


5G: Config w/ NetConfOskar MalmSDC, SO, SDNC, CCSDK, VNFRQTS5G - Configuration with NETCONF

5G: PNF PnP

e2e automation


SDC: C

SO: C

SDNC: C

CCSDK: C

SDNC: NETCONF/TLS support in controller committed from Ericsson

Additional development (SDC, SO, CCSDK) for PNF configuration UC is coordinated with CDS / e2e automation. See separate row for details.

PNF configuration testing: Ericsson

SO: (not a separate initiative uses E2E automation) assign/config building block


AT&T, EricssonNetConf is in development with high corporate commitment
2

Status
colourGreen

5G Use Case (Dublin)

Y

Status
colourGreen
titleGreen

5G Use Case (Dublin)

Y

Status
colourGreen

Code is delivered

5G: FM Meta PM DictionarySDC, VNFRqmt, VES Specification (Done)5G - FM Meta Data / 5G - PM Dictionary

5G: Bulk PM

5G: PNF OB


SDC: CSDC: Commit
AT&T, Ericsson, NokiaFMPM Dictionary is in development with high corporate commitment
2

Status
colourGreen

5G Use Case (Dublin)

Testing resources confirmed by Wipro (Swaminathan S.)

Y

Status
colourGreen

5G Use Case (Dublin)

Y

Status
colourYellow

Code delivered for DCAE and  Policy.

For SDN-C, code delivered for 2 items and 2 items moved to El Alto.

OOF code work ongoing. Will be submitted.


5G: OOF & PCISDC, APP-C, DCAE, OOF, Policy, VNFRqmt5G - OOF and PCI (Casablanca carry-over items)

5G: PNF OB

Control Loop U/C


SDN-C: C

DCAE: C

OOF: C

Policy: C

SDNC: TechMahindra with help from AT&T

DCAE: Committed based on Wipro contribution

OOF: Commit

Policy: Committed based on Wipro contribution


AT&T, Wipro, Tech Mahindra

OOF/PCI Enhancements is in development with high corporate commitment

Dublin Release Requirements I added policy because my understanding from Dublin Release Requirements there are additions for 5G - OOF and PCI

2

Status
colourGreen

5G Use Case (Dublin)

Confirmed by Dublin Release Requirements that testing resources have been identified

Y

Status
colourGreen
titleGreen

5G Use Case (Dublin)

Y

Status
colourGreen

Code is delivered



5G: PNF Plug and Play & PNF Re-registrationBenjamin CheungSDC, Portal, VID, SO, A&AI, SDN-C, DCAE5G - PNF Plug and Play (Casablanca carry-over items)BBS

SDC: C

Port: C

VID: C

SO: C

A&AI: C

SDN-C: C

DCAE: C

AAF: C

Portal: Commit (AT&T)

VID: Commit

SO: Committed based on the contributions from Nokia (confirmed)

A&AI: Commit

CCSDK/SDN-C : Committed to Tosca ingest changes

DCAE: Committed based on the contributions from Nokia

AAF: Commit

AAI: schema / model changes. (Jan 30 James Forsyth has ok'ed A&AI commitment)

PORTAL: Targets only the top menu integration required for 5G use case functions from VID and SDC/AAI

VID: A&AI schema alignment (agreed)

AT&T, Huawei, Ericsson, NokiaPNF PNP Enhancements is in development with high corporate commitment
2

Status
colourGreen

5G Use Case (Dublin)

Y

Status
colourGreen

5G Use Case (Dublin)

Y

5G: Network SlicingBorislav GlozmanSDC, Modeling Sub-committee5G - Slicing

SDC: C

Model: TO

SDC: Commit

Model: Commit


AT&T, Amdocs, EricssonNetwork Slicing has only modeling work that is being done in R4.
2

Status
colourGreen

5G Use Case (Dublin)

YY

Status
colourGreen

Codes delivered and ready for integration tests.

5G - PNF SW Upgrade (Casablanca carry-over items)


5G: PNF Software UpgradeUlas KozatSDN-C5G - PNF SW Upgrade (Casablanca carry-over items)

SDN-C: CSDN-C: Commit based on contributions from Huawei
Huawei
0

Status
colourGreen

Y

Status
colourGreen

BBS Dublin M3 Checklist

Y

Status
colourGreen
titleGREEN

Most of the code has been merged or is pending for review.

SO enhancements and APEX policy rule for BBS has been submitted, minor fixes will be done in the next 1-3 days and proceed with testing.

BBS Use Case Tracking (Dublin Release)


BBSDavid Perez CaparrosDCAE, ExternalAPI, Modeling, SDNC, SOBBS Broadband Service Use Case (Dublin)PRH - 5G Use Case

AAI:
(using 5G use case PNF discovery and re-registration: TO

DCAE: C

ExtAPI: C

SDC: TO

SO (using 5G use case PNF discovery and re-registration): TO

Policy: TO

CLAMP: TO

SDNC: C

Modeling: design


DCAE: Committed based on contribution from Huawei, TechM and Nokia

ExternalAPI: Committed

SO: 5G PNF Committed based on the contributions from Nokia /Huawei

SDNC: Committed based on contributions from BBS team

Modeling: contributions from Swisscom/Huawei/Nokia


AAI: assuming schema/model changes only contributed by community. Also depends on AAI modelling SME availability


Nokia, Swisscom, Huawei,
TechM


(star) T-Shirt Size: Ballpark estimation for assessing the development/testing activities performed by the project team; not the integration team

  • XS - <4 Man/Weeks;
  • S - ~6 Man/Weeks;
  • M - ~8 Man/Weeks;
  • L - ~12 Man/Weeks;
  • XL - > 12 Man/Weeks.

Functional Requirements

M1 Scorecard:

  • Green: The functional requirement will be fully implemented and tested
  • Yellow:  The functional requirement will be partially implemented. It is possible to identify capabilities for this functional requirement that can be tested (phasing approach).
  • Red: The functional requirement can not be partially delivered, min. requirements can not be met in order to define a testing strategy
PriorityM1 ScorecardTSC M1 ApprovalM3 ScorecardM3 TSC ApprovalM4 ScorecardTSC M4 ApprovalFunctional RequirementOwnerProject ImpactedLink(s) to HLD/LLD if anyDependency (from/to) another project(s)T-Shirt Size (XS, S, M, L, XL) (star)Project's Impact: Test Only (TO), Code (C)Committed (C)/Partially Committed (P) or not (N) per Impacted projectsIf Partially or not Committed, what are gaps/ project (people/FTEs; HLD/LLD; etc)Company EngagementNotes
2

Status
colourGreen

YY

Consistent ID of a Cloud Region (Dublin)Bin YangSDNC & APPC , VID, SO, UUI, VFC, OOFConsistent ID of a Cloud Region (Dublin)

APPC(TO, code already exists),

SDN-C: test support only

SO: Support testing effort, changes are likely in.

VFC:Committed

UUI:Committed

VID: Committed based on ATT resources


AT&T

China Mobile


2

Status
colourGreen

Y

Status
colourGreen

M3 Gate (Dublin HPA)


Y

Status
colourYellow

Pending code review and integration


Continuation of HPA (Dublin)Alexander VulVNFSDK, SDC, SO, VF-C, OOF, AAI, Policy, Multi-CloudContinuation of HPA (Dublin)SDC - Jira bugs open, OL001 compatibility requirements addressed.

AAI: TO

SO: Code Hardening, Expansion of use-case support, testing


AAI: assuming schema/model changes only contributed by community. Also depends on AAI modelling SME availability

Intel

ARM(???)

Development t resources from ARM are required to test HPA support on ARM hardware
2

Status
colourGreen

Y

Status
colourGreen

M3 Gate (Dublin Scaling)

Y

Status
colourGreen
titleGreen


Scaling Use Case (Dublin)Scott BlandfordMain focus on DCAE/CLAMP & PolicyScaling Use Case (Dublin)

DCAE: TO

CLAMP: Committed (Based on TechM resource commitment)

Policy: Committed (Based on TechM Resource Commitment)




0

Status
colourGreen

Y

Y

Status
colourGreen
titleGreen

Code delivered in SDC, SO and MultiCloud. Pending Integration.


K8S based Cloud Region SupportMulti-Cloud, AAI, SDC, SOK8S based Cloud Region Support

AAI: TO

SDC & SO: Committed based on Intel/VMWare contribution

AAI: Partially committed

AAI: assuming schema/model changes only contributed by community. Also depends on AAI modelling SME availability

Intel, VMWareTesting confirmed by INTEL
3

Status
colourGreen

POC for Dublin under Multi-Cloud umbrella


Y


Y

Status
colourYellow

Day-2 Configuration and Visualization package is pending.


Distributed Analytics as a Service (Dublin Summary) - Edge Automation

Demo


Distributed Analytics as a Service (Dublin Summary) - Edge Automation

Demo (C)Only demo repositoryDay-2 Configuration and Visualization package is pending. Planning to complete this by RC0.VMware, Intel

Testing confirmed by INTEL

2

Status
colourGreen

SO (AT&T) and VID

(Nokia) Testing confirmed by CM Team (AT&T)

Y

Status
colourGreen

Y

Status
colourYellow

VID functionality completed; SO blocked by SDC issue in deploying workflow into SO


Change Management Dublin Extensions - Flexible designer/orchestratorSO, VIDChange Management Dublin Extensions

SO (C),

VID (C)

SO: Committed (AT&T)

VID: pending final decision from Nokia (stretch goal)


AT&T

Nokia



2

Status
colourGreen

Testing confirmed by Orange and AT&T

YY

Status
colourYellow

Functionality completed; Working on code coverage; code is yet to be merged


Change Management Dublin Extensions - Traffic Migration
APPC, OOFChange Management Dublin Extensions

APPC (C),

OOF (C),

A&AI (TO)

APPC: Committed (Orange)

OOF: Committed (Orange)


Orange


2

Status
colourGreen

Testing confirmed by AT&T

Y

Status
colourGreen

New CMSO APIs in Dublin

Y

Status
colourYellow

Feature completed; working on code coverage


Change Management Dublin Extensions - Schedule OptimizationOOFChange Management Dublin Extensions

OOF (C),

Policy (TO)

OOF: Committed (AT&T)
AT&T
3

Status
colourGreen

Testing confirmed by AT&T

Y

Y
Status
colourGreen
titleGreen

Model Driven Control Loop Design (Close Loop sub-committee)DCAE, CLAMP, Policy

Model driven Control Loop Design





DCAE: AT&T Committed

CLAMP: Committed

Policy: Committed

AT&T commits to finding the required resources

AT&T, Nokia
3

Status
colourGreen

SO Only

Testing confirmed by SO Team

Y


Status
colourGreen

Y

Status
colourGreen


Modularity

SO, SDC, VFC, APPC, SDNC

https://wiki.onap.org/download/attachments/45293323/2018-12%20Virt%20F2F%20-%20%20Dublin%20Architecture%20Requirements-pa3.pptx?version=1&modificationDate=1544650581000&api=v2


https://jira.onap.org/browse/CCSDK-575




SDC: Not committed

APPC: Not committed

SO: Committed based on the code from R3

SDNC: Not committed

VFC: Partially committed

SDC: no resources, not enough info

APPC: no resources

SDNC: no resources

VFC: optimize DB microservice

CDS project will provide Resource assignment functionality



3

Status
colourGreen

ETSI Alignment

SOOL003 plug-in to SO

Ericsson confirmed the integration testing resource for the ETSI SOL003-plugin support


Y

Status
colourGreen

Y

ETSI Alignment

SO plugin to support SOL003 to connect to an external VNFM

SO, SDC, AAI,https://wiki.onap.org/download/attachments/45293323/2018-12%20Virt%20F2F%20-%20%20Dublin%20Architecture%20Requirements-pa3.pptx?version=1&modificationDate=1544650581000&api=v2


SDC: Partially committed (based on Ericsson contribution)

SO: Committed (SOL003) based on contribution from Nokia and Ericsson

AAI: Not Committed

SDC: no resources

.AAI: no resources (detailed impact to be discussed) Action Byuong




4

Status
colourRed

Architecture did not approve

N



OSAM/PNF??????






4

Status
colourRed

N



TOSCA Task Force???https://wiki.onap.org/download/attachments/45293323/2018-12%20Virt%20F2F%20-%20%20Dublin%20Architecture%20Requirements-pa3.pptx?version=1&modificationDate=1544650581000&api=v2


OOF: Policy Tosca model API and ONAP CLI integrationIntel

4

Status
colourRed

N



Alloted Network Function??????






 3

Status
colourGreen

Prabhu Balan – (prabhu.balan1@vodafone.com) from Vodafone.

Sean Joseph (sjoseph1@iconectiv.com)  from iconnectiv.

Y

Status
colourGreen

Y

Status
colourGreen


Phase 1 - VSP Compliance Check

 SDC

CLI/VNFSDK

 VSP Compliance Check within SDC (Dublin)   SDC: Committed based on contribution from VF, Huawei and iconectiv

Vodafone, iconectiv, huawei

  

(star) T-Shirt Size: Ballpark estimation for assessing the development/testing activities performed by the project team; not the integration team

  • XS - <4 Man/Weeks;
  • S - ~6 Man/Weeks;
  • M - ~8 Man/Weeks;
  • L - ~12 Man/Weeks;
  • XL - > 12 Man/Weeks.

Non-Functional Requirements

M1 Scorecard:

  • Green: The non-functional requirement will be fully implemented and tested
  • Yellow: The non-functional requirement will be partially implemented. It is possible to identify capabilities for this non-functional requirement can be tested (phasing approach).
  • Red: The non-functional requirement can not be partially delivered, min. requirements can not be met in order to define a testing strategy
PriorityM1 Scorecard

TSC M1

Approval

M3 ScorecardM3 TSC ApprovalM4 ScorecardTSC M4 ApprovalNon Functional RequirementOwnerProject ImpactedLink(s) to HLD/LLD if anyDependency (from/to) another project(s)T-Shirt Size (XS, S, M, L, XL) (star)Project's Impact: Test Only (TO), Code (C)Committed (C)/Partially Committed (P) or not (N) per Impacted projectsIf Partially or not Committed, what are gaps/ project (people/FTEs; HLD/LLD; etc)Company EngagementNotes
1

Status
colourGreen

It will not include the following items in Dublin
  1. Support TOSCA network constructs
  2. Single click instantiation (Using VID)

Y


Status
colourGreen

Y

Status
colourGreen

End 2 End tests to start


Improve our E2E Process Automation

SO
SDC
CCSDK
OOM
Testsuite
Documentation

Jira
serverONAP JIRA
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
serverId425b2b0a-557c-3c0c-b515-579789cceedb
keyTSC-53

https://wiki.onap.org/download/attachments/48529726/ONAP-E2E-Automation-v3.pptx?api=v2

AAI
AAF
DMaaP
Policy

PNF use case (5G)
XL

Code:
SO
SDC
CCSDK
OOM
Testsuite

APPC (CDS)

TO:
AAI
DMaaP
Policy


SDC:
TechM (C)
IBM (C)

CCSDK:
ATT (C)
Bell   (C)
IBM (C)
Ericsson (C)
TechM (C)

SO:
Ericsson (C)
Bell (C)
ATT (P)

OOM:
Orange (P)
Bell (C)

Testsuite:
Orange (C)
Huawei (C)
Dutch T (C)

Documentation:
Orange (C)
Bell (C)
Dutch T (C)

AAI: TO


AT&T
Bell Canada
Ericsson
Huawei
IBM
Orange
Tech Mahindra


1

Status
colourGreen

Container optimization : on –going (eg SDNC)

Testing Strategy

https://lists.onap.org/g/onap-tsc/message/4605


Y

Status
colourGreen

Reduction effort between Casablanca and Dublin

Some old images to be renewed

CIA team will endorse SDC

Optimized Docker excpected to be ready for RC0

Y

Status
colourGreen


S3P - Footprint Optimization (Integration with Alpine)

Alpine is the target, but possibility to use oother based OS (cf TSC 2019-02-28)

OOM + ALL

https://wiki.onap.org/download/attachments/45293323/Dublin-Footprint-Optimizations.pdf?version=1&modificationDate=1544543600000&api=v2

CIA Dublin Release Planning

Documentation by PTL no more useful: the wiki page will provide weekly information:

Effort also required to avoid old images, cf JIRA tickets

Jira
serverONAP JIRA
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
maximumIssues20
jqlQuerykey in ()
serverId425b2b0a-557c-3c0c-b515-579789cceedb






SDC: N

CCSDK, CLAMP: Committed

Multi-VIM/loud: committed

Policy: committed

DCAE: Not committed

SDC: no resources


DCAE: Resource constraint

Orange

OAM

Amdocs

+ PTL


1

Status
colourGreen

Component/memory optimization: Ongoing Assessment

Testing Strategy

https://lists.onap.org/g/onap-tsc/message/4605


Y

Status
colourGreen

Global effort to optimize resources for small installation

Capabilities to configure JAVA_OPTS for Java based images


Y

Status
colourGreen


The ONAP Minimal Deployment target OK.

Some attention required for AAI

 



OOM + ALL

https://wiki.onap.org/download/attachments/45293323/Dublin-Footprint-Optimizations.pdf?version=1&modificationDate=1544543600000&api=v2

CIA Dublin Release Planning

Checklist and wiki to be published.





SDC: N

CCSDK, CLAMP: Committed

Multi-VIM/loud: committed

Policy: committed

DCAE: Not committed

SDC: no resources


DCAE: Resource constraint

Orange

OAM

Amdocs

+ PTL

1

Status
colourGreen

Global optimization (e.g. shared DB) - stretch goal=shared PostgreSQL; shared MariaDB

Testing Strategy

https://lists.onap.org/g/onap-tsc/message/4605


Y

Status
colourGreen

Shared DB instance creation on-going

First integration with ONAP component on-going

Y

Status
colourGreen

Code OK for Mariadb-galera cluster and Cassandra cluster

Integration to be done with A&AI



OOM + ALL

https://wiki.onap.org/download/attachments/45293323/Dublin-Footprint-Optimizations.pdf?version=1&modificationDate=1544543600000&api=v2

CIA Dublin Release Planning

First component using Shared DB: AAI using Cassandra

List of JIRA tickets

Jira
serverONAP JIRA
jqlQuerytext ~ "sharing"
serverId425b2b0a-557c-3c0c-b515-579789cceedb




SDC: N

CCSDK, CLAMP: Committed

Multi-VIM/loud: committed

Policy: committed

DCAE: Not committed

SDC: no resources


DCAE: Resource constraint

Amdocs
1

Status
colourGreen

Manual PH1

Yes with limited scope: Manual PH1



Status
colourGreen

Healthcheck gate is operational

Y

CI/CD

OOM + Integration

(Infrastructure)


Jira
serverONAP JIRA
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
serverId425b2b0a-557c-3c0c-b515-579789cceedb
keyTSC-25

Integration

Logging

OOM

+ ALL (helm charts)

L

no except devops/scripts

in

oom/integration

OOM:

Linux Foundation (C)

Orange (C)

Bell (C)

Amdocs (C)

Logging:

Bell (C)

Amdocs (C)

Integration:



Amdocs

Orange

Linux Foundation

Bell

Huawei


1

Status
colourGreen

Yes

Status
colourGreen

Y

Document as You CodeALLTracked in JIRA - Label: Documentation






1

Status
colourGreen

Security Checklists integrated to the Release Milestone templates

Yes


Status
colourGreen

Y

Security by DesignSecurity SubcommitteeALL

https://wiki.onap.org/download/attachments/45293323/2018-12%20Virt%20F2F%20-%20%20Dublin%20Security%20-%20Requirements-pa2.pptx?version=1&modificationDate=1544453068000&api=v2








1

Status
colourRed

De-scoped from Dublin - TSC decision on 2/21





Modeling M3 Checklist enhancementModeling SubcommitteeSO, SDC, VFC, APPC, VNFSDKProposed M3 Checklist modeling updates discussion


VFC: Committed


1

Status
colourGreen

AAI POC performed by Dublin Release Requirements on TSC Call 2/14

Y

<FOLLOW UP>Waiting for inputs

S3P - Provide Upgrade Capabilities PH1OOM supported by A&AI, SO, SDC and SDNCDublin Release Platform Maturity





In Dublin will establish plan & basis for platform release upgrade strategy to be implemented in following release.
1

Status
colourGreen

Y

Status
colourGreen

In progress:

Jira
serverONAP JIRA
serverId425b2b0a-557c-3c0c-b515-579789cceedb
keyOOM-1240

Y

Move Helm Chart (OOM) at project levelOOM + ALL



During the PTL meeting on 12/17 -it was agreed that

No enforcement to make it happen for all project in Dublin release, but expectation to to completed within El Alto release. This could potentially be a S3P items.

6 projects have been identified for trial: Logging, Policy, APPC, CLAMP, AAI and ONAP CLI



1

Status
colourGreen

Y

Status
colourGreen

Y

oParent Integration to fix vulnerabilities

Security Subcommittee

Yang Xu

Integration +ALL


Modeling: TO

AAI, DCAE, DMaaP, Holmes, Logging, Modeling, MSB, Multi-Cloud, ONAP CLI, UUI, Policy, Portal, SO, VFC, VNFSDK, AAF,CLAMP, MUSIC: Already Integrated

ExtApi, VID: Committed

SDC: Not Committed

CCSDK/SDNC, OOM, APPC, OOM: No

CCSDK/SDNC, APPC: dependency on ODL

OOF (HAS, OSDF): python, not Java

SDC: No resource

OOM: No java code




1

Status
colourGreen

Reviewed on 2/14 with the Integration Team

Final presentation to the PTLs on 2/19

Yes



Status
colourGreen


Some teams raising requests/risks to get help achieving this by M4.

Y

Additional functional tests delivered per project on OOM


View file
nameDev Testing_Enhancement for Dublin.pptx
height250

Infrastructure capacity





2

Status
colourGreen

See Dublin Release Platform Maturity

Yes

Status
colourGreen

OOF is running in multiple geos. Portal also using MUSIC. SDC & Policy will be in next release.

Y

S3P- Geo-Redundancy

OOM (introduction of CNI)/MUSIC capabilities leveraged by initial ONAP Components i.e. OOF, Portal, SDC

Platform Maturity Resiliency Requirements






2


Status
colourGreen

Yes

Status
colourGreen

Y

SOL 004 (VNF Package Security)Samuli KuuselaSDC, VNFSDK

SDC:

Jira
serverONAP JIRA
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
serverId425b2b0a-557c-3c0c-b515-579789cceedb
keySDC-1980
Jira is for PNF package.

VNFSDK:
Partially implemented in Casablanca
.

Jira
serverONAP JIRA
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
serverId425b2b0a-557c-3c0c-b515-579789cceedb
keyVNFSDK-342




SDC and VNFSDK: Committed based on Ericsson and Nokia contribution.

In Dublin will implement the 5G Use Case scope as minimum. Possible left overs in El Alto.
3

Status
colourGreen

Testing confirmed by Nokia - Przybysz, Marcin


Yes

Status
colourYellow
titleYELLOW

ONLY DCAE component. No other projects securing the xNF comms.

Need review at TSC

Status
colourGreen



xNF communication security enhancements.

DCAE

Slide presented on PTL Call (1/14/2019)

DCAEGEN2-1101 - DCAE enhancements to support certificate authentication for HTTPS.  All HTTPS connections from xNFs go to DCAE so no other projects need to be updated.

DCAEGEN2-978 - DCAE replaces clear text password with hash.




DCAE - Committed based on Nokia's contribution


Controller part (SDNC) committed from Ericsson, see 5G UC. 


NokiaController part is covered under the 5G Use Case. It is not covered under this item.
4

Status
colourRed

No



S3P - Service Mesh (ISTIO)Security & Architecture SubcommitteesALL except MSB or performed at K8S level (OOM); Poc of ISTIO plug-in to AAF not resourcedhttps://wiki.onap.org/download/attachments/45293323/2018-12%20Virt%20F2F%20-%20%20Dublin%20Architecture%20Requirements-pa3.pptx?version=1&modificationDate=1544650581000&api=v2






4

Status
colourRed

No



S3P Manageability - Logging Capabilities

see yellow/red in

in progress

log, aaf cli, consul, contrib, dcae, dmaap, nbi, oof, sdnc, so, uui, vid, vnfsdk, vvp

good

aai, appc, clamp, esr, multicloud, policy, pomba, portal, sdc, vfc


Library: In progress portal/sdk and possible so library adjustment

Jira
serverONAP JIRA
serverId425b2b0a-557c-3c0c-b515-579789cceedb
keyPORTAL-348

Infrastructure: dmaap is adding containers, need to work with other teams in red

Jira
serverONAP JIRA
serverId425b2b0a-557c-3c0c-b515-579789cceedb
keyDMAAP-853

as part of overall

Jira
serverONAP JIRA
serverId425b2b0a-557c-3c0c-b515-579789cceedb
keyLOG-487

Log

OOM

Portal

SO

AAI


OOM (c)

LOG (c)

Portal (c)

SO (c)

AAI (c)

Multicloud(c)

LOG/POMBA

OOM



Amdocs

AT&T

Bell

Hauwei

Intel



3

Status
colourGreen

No particular Integration Testing required.

Portal/UUI Teams will provide the testing resources

Y

Status
colourGreen

Implementation complete - test phase

Waiting for inputs

Locale/Internationalization language supportPortal, UsecaseUIInternationalization language supportPortal, UsecaseUIL

Code:
PORTAL, UsecaseUI

UsecaseUI (C)


3

Status
colourGreen

Development Stretch Goal for Dublin. No particular Integration Testing required. Portal container at RC0 will be the final version to be tested

Y

Status
colourGreen

Y

Angular 6 Upgrade of ONAP Portal and SDKPortal

Jira
serverONAP JIRA
serverId425b2b0a-557c-3c0c-b515-579789cceedb
keyPORTAL-330

PortalXL

Code:

PORTAL

TO:

Policy, VID

PORTAL (C)


(star) T-Shirt Size: Ballpark estimation for assessing the development/testing activities performed by the project team; not the integration team

  • XS - <4 Man/Weeks;
  • S - ~6 Man/Weeks;
  • M - ~8 Man/Weeks;
  • L - ~12 Man/Weeks;
  • XL - > 12 Man/Weeks.

Dublin POC / Experimentation

POC Definition - (In Progress)

TypeRequirementOwnerProject ImpactedLink(s) to HLD/LLD if anyDependency (from/to) another project(s)T-Shirt Size (XS, S, M, L, XL) (star)Project's Impact: Test Only (TO), Code (C)Company EngagementNotesM4 Status
Functional Requirement

Self Serve Control Loop (Closed Loop Subcommittee)

DCAE, Policy, SDC


Model driven Control Loop Design

This is a stretch goal for Dublin.  We are still trying to align resources so that this can be accomplished this release



DCAE: Stretch Goal

Policy: Stretch Goal

SDC: Stretch Goal

AT&T

Functional RequirementFine-Grained Placement Service (F-GPS) - Edge Automation
Multi-Cloud, OOF

https://wiki.onap.org/download/attachments/45293323/2018-12%20Virt%20F2F%20-%20%20Dublin%20Architecture%20Requirements-pa3.pptx?version=1&modificationDate=1544650581000&api=v2

F-GPS (Dublin Summary)


OOF: Committed

MultiVIM/Cloud: Committed

End-to-end Use Case Integration: Stretch Goal (due to several workflow changes)

IBM, AT&T, VMware (Architecture/Modelling), Intel (Architecture),




Sub-ProjectDataLakeDCAE



China Mobile, Huawei, ZTE, VMware

Sub-ProjectComposable Disaggregrated Infrastructure (CDI)@Alex VulMulti-Cloud



Intel

Non-Functional Requirement

CI/CD

Magic word "run-helm-deploy" in queue at LF, Orange and Log team

Move to POC


OOM + Integration

(Infrastructure)

OOM Gating


Amdocs

Orange

Linux Foundation

Bell

Huawei



Non-Functional RequirementMulti-Architecture SupportComponents used by vFW

-Healthcheck

-vFW




ARM

Functional RequirementETSI Alignment

SO plugin to support SOL005 to connect to an external NFVO

SO, AAI, ESR, VFC, UUI

https://wiki.onap.org/pages/viewpage.action?pageId=58229331

https://wiki.onap.org/download/attachments/45293323/2018-12%20Virt%20F2F%20-%20%20Dublin%20Architecture%20Requirements-pa3.pptx?version=1&modificationDate=1544650581000&api=v2








(star)T-Shirt Size: Ballpark estimation for assessing the development/testing activities performed by the project team; not the integration team

  • XS - <4 Man/Weeks;
  • S - ~6 Man/Weeks;
  • M - ~8 Man/Weeks;
  • L - ~12 Man/Weeks;
  • XL - > 12 Man/Weeks.