Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...


Use CaseLabResponsibleStatusUse Case Details Testing StatusQuick Notes
1vFW / vDNS

Intel / Windriver

Status
colourGreen
titleCompleted


vFW / vDNS

Passed on boarding and instantiation. vFW Closed Loop passed on staging. vFWCL has been fully automated and now runs as part of daily deployment tests.


SDNC Preload - PASS

VID Preload - PASS    - See VID Preload Upload Option Steps

2

vCPE Integration Test Case

Intel / Windriver

Status
colourGreen
titleCompleted


vCPE Integration Test Status

Onboarded 5 HEAT templates for infra, vbrg, vbng, vgmux and vgw, and created 5 VNFs.

Finished services creation and distribution

Infra, vBRG, vBNG, vGMUX have instantiated with manually insert the entries in SO table

vCPE vGW Instantiated

Static Route from SDNC to vBNG is done

Network Path Confirmation: confirmed

Closed Loop Test: WIP 

Jira
serverONAP JIRA
serverId425b2b0a-557c-3c0c-b515-579789cceedb
keyAPPC-1241
Jira
serverONAP JIRA
serverId425b2b0a-557c-3c0c-b515-579789cceedb
keyAPPC-1247
Jira
serverONAP JIRA
serverId425b2b0a-557c-3c0c-b515-579789cceedb
keyCCSDK-741


Jira
serverONAP JIRA
serverId425b2b0a-557c-3c0c-b515-579789cceedb
keySO-1184

Jira
serverONAP JIRA
serverId425b2b0a-557c-3c0c-b515-579789cceedb
keySDNC-511

3

vCPE with TOSCA VNF Test Case

CMCC

Yan Yang

Yang Xu (liaison)



Status
colourGreen
titleCOMPLETED

Finish the testing on release.

vCPE with TOSCA VNF Integration Test Status (With HPA)

Redeployed ONAP due to resource limitation, restarting design time testing: DONE

UUI trigger SO and SO bpmn workflow execute error, SO team are checking this error.

Jira
serverONAP JIRA
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
serverId425b2b0a-557c-3c0c-b515-579789cceedb
keySO-1235


when updating the SO images in vCPE env.  And the error is the same, Seshu said it's related with

Jira
serverONAP JIRA
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
serverId425b2b0a-557c-3c0c-b515-579789cceedb
keySDC-1947


Because SO can't work now , currently we use UUI to trigger the whole CPE NS lifecycle management.


4

5G - Real Time PM and High Volume Stream Data Collection - Integration Test Status

TLab

Status
colourGreen
titleCOMPLETED


5G - Real Time PM and High Volume Stream Data Collection - Integration Test Status

It has been passed the test at Nokia lab. All pairwise testing has done at Windriver lab. End to end testing has done with staging. Will re-test with release when it is ready.

5

5G - PNF PnP - Integration Test Status

TLab

Status
colourGreen
titleCompleted

5G - PNF PnP - Integration Test Status

We were able to run whole flow, but we found out new issue. SO communicate with PRH using wrong topic.

Bug

Jira
serverONAP JIRA
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
serverId425b2b0a-557c-3c0c-b515-579789cceedb
keySO-1191
 is raised. Fix planned to be delivered 11/9 EOD

Bug

Jira
serverONAP JIRA
serverId425b2b0a-557c-3c0c-b515-579789cceedb
keySO-1212
is raised. Fix planned to be delivered 11/15 EOD

Tested on ONAP 5g project in TLab

There is an issue with Execution which would be resolved in Casablanca maintenance patch

Jira
serverONAP JIRA
serverId425b2b0a-557c-3c0c-b515-579789cceedb
keySO-1253
Workaround described in bug


6

5G - Bulk PM - Test Status

TLab

Status
colourGreen
titleCompleted


It has passed the tests at Ericsson lab.

Tested on SB-04

7

5G - OOF and PCI - Integration Test Cases

Rutgers Winlab ONAP Wireless Lab (OWL)

Status
colourGreen
titleCOMPLETED

Proof of Concept only for Casablanca




5G - OOF and PCI - Integration Test Cases

OOF-SDNR pairwise test completed. All other test cases are for POC only. Please see POC Test aspects. New software modules being installed in Rutgers OWL lab. Upgraded ONAP from Beijing to Casablanca. Doing PoC with Casablanca code from Policy, OOF.

Latest: Paring wise testing with OOF is completed. Other is waiting for the full installation with OOM in testing lab with Casablanca.

8

5G - PNF Software Upgrade - Integration Test Cases

Intel / Windriver

Status
colourGreen
titleCompleted

The test had passed at Huawei lab HEAT env. Retested in Windriver lab OOM env SB-039

Scale Out - Integration Test Cases and Status

Intel / Windriver

Status
colourGreen
titleCOMPLETED

Scale Out - Integration Test Cases and Status

All the test cases have been successfully tested in Integration-SB-04 using the latest released docker images.


Detailed status may be found on the Scale Out Tracking Page


109CCVPN Integration Test CasesCMCC

Yan Yang

Yang Xu (liaison)

Status
colourGreen
titleCOMPLETED

For blocking issues, using manual steps have finished the testing. All manual steps can be found here Manual steps for CCVPN Integration Testing

CCVPN -Test Status

Demoed at ONS Europe. The optical equipment has delivered to CMCC, and they are manually testing the optical equipment.

Redeployed ONAP due to resource limitation, restarting design time testing: DONE

Jira
serverONAP JIRA
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
serverId425b2b0a-557c-3c0c-b515-579789cceedb
keyDMAAP-885
has solved.

holmes now can start up , use the manual method which recorded in

Jira
serverONAP JIRA
serverId425b2b0a-557c-3c0c-b515-579789cceedb
keyHOLMES-175
and Vijay's steps.

Block isssue is

Jira
serverONAP JIRA
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
serverId425b2b0a-557c-3c0c-b515-579789cceedb
keySDC-1947
There is still issue with the SDC distribution that is being checked, will re-open/close the defect based on the confirmed test today EOD

Jira
serverONAP JIRA
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
serverId425b2b0a-557c-3c0c-b515-579789cceedb
keyAAI-1925
has been delivered and have been replaced in test env, need UUI team to be verified


Jira
serverONAP JIRA
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
serverId425b2b0a-557c-3c0c-b515-579789cceedb
keySDC-1958
UUI can’t parse the service template using SDC tosca parser, so the service creation haven’t triggered by UUI.

Jira
serverONAP JIRA
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
serverId425b2b0a-557c-3c0c-b515-579789cceedb
keySDC-1955
N PROGRESS In Pogress, This issue is being checked by Michael.


1110

VFW HPA Testing

(Test Plan 1 in

HPA & Cloud Agnostic Intent - R3 Test Plan)
Intel / Windriver

Status
colourGreen
titleCompleted



vFW with HPA Integration Test - Test Status

The testing has been started at Intel, and start testing at SB-06 with HPA.

  • Registered 3 cloud regions with ONAP
  • Created 3 HPA flavors in each of the cloud
  • Triggered multicloud plugin registration and confirmed that the HPA capabilities of the flavors were discovered. The HPA capabilities of the flavors showed up when AAI was queried.
  • Put in policy for the first test case, created service instance and confirmed that oof sent the right cloud region for homing and the right flavor directives for each vm.
  • Onboarded new vFWHPA heat templates
  • Created a service instance that uses OOF and homing and confirmed that the right homing solution and OOF directives were present in the log.
  • Tested SO with OpenStack directly: DONE
  • SO with VIM has issue with header authorization options (
    Jira
    serverONAP JIRA
    serverId425b2b0a-557c-3c0c-b515-579789cceedb
    keySO-1257
    )

NEXT STEPS

  • 11/27 afternoon (about 2:30PM EST): Continuing HPA testing with direct Openstack route
  • 11/28 (8AM PST / 11AM EST): Checking back what vim path
  • Create VNF to use cloud homing info and flavor directives (and vnic type in case of SRIOV NIC)
  • Create VF module to use cloud homing info and flavor directives (and vnic type in case of SRIOV NIC)
    Jira
    serverONAP JIRA
    serverId425b2b0a-557c-3c0c-b515-579789cceedb
    keySO-1254

    Jira
    serverONAP JIRA
    serverId425b2b0a-557c-3c0c-b515-579789cceedb
    keySO-1251

  • Jira
    serverONAP JIRA
    serverId425b2b0a-557c-3c0c-b515-579789cceedb
    keyMULTICLOUD-418


    11/29
  • Jira
    serverONAP JIRA
    serverId425b2b0a-557c-3c0c-b515-579789cceedb
    keySO-1258
    basically same issue as SO-1254 has been completed and tested.
1211Change Management - Flexible Designer & Orchestrator Intel / Windriver

Status
colourGreen
titleCOMPLETED



Jira
serverONAP JIRA
serverId425b2b0a-557c-3c0c-b515-579789cceedb
keySO-1214

Testing completed on SB-04 - Summary: Workflow design, testing/certification, distribution, deployment and verification is completed. There is an issue with Execution which would be resolved in Casablanca maintenance patch 

1) SO uploading a list of activities/building blocks to SDC - successfully tested

2) Design workflow in SDC and distribute to SO is completed successfully! Thanks to Michael & Priyanshu for resolving issues.

3) Deploy workflow in SO and orchestrate the execution of the workflow - successfully tested the deployment. Hit an issue on orchestration (

Jira
serverONAP JIRA
serverId425b2b0a-557c-3c0c-b515-579789cceedb
keySO-1243
) - will be resolving soon - will be deploying in Casablanca mostly as a patch. 

1312Change Management - Traffic Management-Intel / Windriver

Lukasz Rajewski

Tomasz Osinski

Status
colourGreen
titleCOMPLETED



Testing completed by Orange (Lukasz and Tomek) in SB-07 using vFW

Testing completed by Orange (Lukasz and Tomek) on OOM and release dockers in SB-04.

1413

Change Management - 5G PNF in-place software upgrade

Intel / Windriver

Status
colourGreen
titleCOMPLETED



Testing completed by Huawei (Yaoguang) in Huawei lab using EM and PNF emulator. Retested in Windriver lab OOM env SB-03 (Yang Xu).
1514Change Management - Schedule optimizationIntel / Windriver

Status
colourGreen
titleCOMPLETED


Functional testing completed. E2E testing in Dublin.


Functional testing completed by Jerry in OOM Staging Daily Windriver.