vFW / vDNS : Brian Freeman / Marco Platania
--@TLab and Windriver
Status: In progress (SB-04)
vCPE Integration Test Case: Yang Xu
--@WindriverStatus: Waiting for platform pass the basic test
vCPE
...
(tosca) with HPA - Integration test cases Huang Haibin Yan Yang
--@Windriver (Intel) / @CMCC (China Mobile ...)
vCPE(tosca) - Integration test cases : Liping Zhao
--@CMCCStatus: After RC0
5G - Real Time PM and High Volume Stream Data Collection - Integration Test Cases: Marcin Przybysz Marek Pondel
--@TLabStatus: It has been passed the test at Nokia lab. Planned to start the test at TLab at 10/11/2018, but the lab was not ready.
5G - PNF PnP - Integration Test Cases: Marcin Przybysz Krzysztof Kuzmicki
--@TLab
Status: End to end test case has been implemented at Nokia lab. Waiting for the new docker images for SO and VID.
...
5G - Netconf configuration over TLS - Integration Test Cases: Rahul Tyagi Eric Moore Andy Walshe
--@TLab
5G Bulk PM "Data Plane" - Integration Usecase Test Cases: user-3784d Liam Burke
--@TLabStatus: Waiting for ONAP being installed successfully.
5G - OOF and PCI - Integration Test Cases: N.K. Shankaranarayanan
--@Rutgers Winlab ONAP Wireless Lab (OWL)
Status: Ongoing. For test cases, please see Test aspects . New software modules being installed in OWL lab (Need the latest update)
5G - PNF Software Upgrade - Integration Test Cases: Yang Xu
--@Windriver LabStatus: It has been passed the test at Huawei lab. Re-test it at Windriver lab.
Scale Out - Integration Test Cases and Status: Scott Blandford, Marco Platania
--@Windriver Lab
Status: Created policy, control loop, deploy control loop into dcae. (with http and https connections) (At this moment, HEAT) (Need the latest update??)
CCVPN Integration Test Cases: Yang Xu
--@CMCC
Status: Demoed at ONS Europe. The optical equipment has delivered to CMCC, and they are manually testing the optical equipment.
HPA & Cloud Agnostic Intent - R3 Test Plan: Itohan Ukponmwan
--@Windriver Lab
PNF software version onboarding André Schmid
--@Ericsson
PNF Software Upgrade using direct Netconf/Yang interface with PNF Raj Gumma Rahul Tyagi
--@TLabStatus: Waiting for pairwise testing.