You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 39 Next »

vFW / vDNSBrian Freeman / Marco Platania

--@TLab and Windriver

Status: In progress  (SB-04). It is at the stage at distribution.

vCPE Integration Test Case: Yang Xu

--@Windriver

Status: Finished onboarding, instantiation. Now testing closed loop.

vCPE with TOSCA VNF Integration Test Case: Yang Xu / Itohan Ukponmwan

--@Windriver (Intel)  / @CMCC (China Mobile ...)

Status:

Intel: The testing has been started at Intel, and start testing at SB-06 with HPA.

CMCC: 

ONAP deployment have finished

Device have been  ready and begin to install openstack  Pike which used to deploy VNF

Design time testing have started

5G - Real Time PM and High Volume Stream Data Collection - Integration Test CasesMarcin Przybysz Marek Pondel

--@TLab

Status: It has been passed the test at Nokia lab. All pairwise testing has done at Windriver lab. Will do end to end at TLab.

5G - PNF PnP - Integration Test CasesMarcin Przybysz Krzysztof Kuzmicki

--@TLab

Status: End to end test case has been implemented at Nokia lab. Waiting for the new docker images for SO and VID.

5G - Bulk PM - Integration Test Cases: user-3784d Liam Burke

--@TLab

Status: Waiting for ONAP being installed successfully.

5G - OOF and PCI - Integration Test Cases:  N.K. Shankaranarayanan

--@Rutgers Winlab ONAP Wireless Lab (OWL)

Status: Ongoing. For test cases, please see Test aspects . New software modules being installed in OWL lab . Upgraded ONAP from Beijing to Casablanca. Doing PoC for C release, mostly related to Policy, OOF.

Latest: ???

5G - PNF Software Upgrade - Integration Test Cases: Yang Xu

--@Windriver Lab

Status: It has been passed the test at Huawei lab. Re-test it at Windriver lab. (Not started yet,  not much dependency on other components)

Scale Out - Integration Test Cases and Status: Scott Blandford, Marco Platania

--@Windriver Lab

Status: Created policy, control loop, deploy control loop into dcae. (with http and https connections) (At this moment, HEAT). Testing with OOM based deployment: passed distribution and instantiation with walkaround DMAAP/CLAMP.  ( CLAMP-216 - Getting issue details... STATUS ) Still have communication between containers with CDT.

Design closed loop for scale-out: PASS

Runtime for scale VF module (a working session at 10/24 afternoon).

CCVPN Integration Test Cases: Yang Xu

--@CMCC

Status: Demoed at ONS Europe. The optical equipment has delivered to CMCC, and they are manually testing the optical equipment.


Deploy ONAP using OOM  basically completed

Huawei sotn manual testing have completed

ZTE sotn manual testing begin

HPA & Cloud Agnostic Intent - R3 Test PlanItohan Ukponmwan

--@Windriver Lab

Status: The testing has been started at Intel, and start testing at SB-06 with HPA.

  • No labels