Integration Test Working session (weekday): UTC 17:00 / Eastern 13:00 / Pacific 10:00 daily @ https://zoom.us/j/4466668888 before RC2


Use CaseLabResponsibleStatusUse Case Details Testing StatusQuick Notes
1vFW / vDNS

Intel / Windriver

COMPLETED ON STAGING

RETEST ON RELEASE

vFW / vDNS

Passed on boarding and instantiation. vFW Closed Loop passed on staging. vFWCL has been fully automated and now runs as part of daily deployment tests.


SDNC Preload - PASS

VID Preload - PASS    - See VID Preload Upload Option Steps

2

vCPE Integration Test Case

Intel / Windriver

90% WIP

EFFORT TO COMPLETION: 3 DAYS

RESTEST ON RELEASE

vCPE Integration Test Status

Onboarded 5 HEAT templates for infra, vbrg, vbng, vgmux and vgw, and created 5 VNFs.

Finished services creation and distribution

Infra, vBRG, vBNG, vGMUX have instantiated with manually insert the entries in SO table

vCPE vGW Instantiated

Static Route from SDNC to vBNG is done

Network Path Confirmation: confirmed

Closed Loop Test: WIP  APPC-1241 - Getting issue details... STATUS


SO-1184 - Getting issue details... STATUS

SDNC-511 - Getting issue details... STATUS

3

vCPE with TOSCA VNF Test Case

CMCC

Yan Yang

Yang Xu (liaison)



83% WIP

EFFORT TO COMPLETION: 7 DAYS

vCPE with TOSCA VNF Integration Test Status

Redeployed ONAP due to resource limitation, restarting design time testing: DONE

Re-design the service using SDC 1.3.1, during "Certify" operation?the following error appeared ?CSAR packaging failed. TOSCA schema files for SDC-Version: 1.3.3 and Conformance-Level 9.0 were not found

SDC-1914 - Getting issue details... STATUS

4

5G - Real Time PM and High Volume Stream Data Collection - Integration Test Status

TLab

COMPLETED ON STAGING

RETEST ON RELEASE

5G - Real Time PM and High Volume Stream Data Collection - Integration Test Status

It has been passed the test at Nokia lab. All pairwise testing has done at Windriver lab. End to end testing has done with staging. Will re-test with release when it is ready.

5

5G - PNF PnP - Integration Test Status

TLab

COMPLETED ON STAGING

RESTEST ON RELEASE

5G - PNF PnP - Integration Test Status

We were able to run whole flow, but we found out new issue. SO communicate with PRH using wrong topic.

Bug SO-1191 - Getting issue details... STATUS  is raised. Fix planned to be delivered 11/9 EOD

Bug SO-1212 - Getting issue details... STATUS is raised. Fix planned to be delivered 11/15 EOD

Tested on ONAP 5g project in TLab

6

5G - Bulk PM - Test Status

TLab

COMPLETED ON STAGING

RETEST ON RELEASE

It has passed the tests at Ericsson lab
7

5G - OOF and PCI - Integration Test Cases

Rutgers Winlab ONAP Wireless Lab (OWL)

COMPLETED ON STAGING

RETEST ON RELEASE

5G - OOF and PCI - Integration Test Cases

OOF-SDNR pairwise test completed. All other test cases are for POC only. Please see POC Test aspects. New software modules being installed in Rutgers OWL lab. Upgraded ONAP from Beijing to Casablanca. Doing PoC with Casablanca code from Policy, OOF.

Latest: Paring wise testing with OOF is completed. Other is waiting for the full installation with OOM in testing lab with Casablanca.

8

5G - PNF Software Upgrade - Integration Test Cases

Intel / Windriver

COMPLETE ON STAGING

RETEST ON RELEASE


It has passed the test at Huawei lab HEAT env. Retested in Windriver lab OOM env.
9

Scale Out - Integration Test Cases and Status

Intel / Windriver

COMPLETED ON STAGING

RETEST ON RELEASE

Scale Out - Integration Test Cases and Status

All the test cases have been successfully tested in Integration-SB-04

There is still some non-blocking testing that must be done to show the test case works using SDNC as the VNF Controller


Detailed status may be found on the Scale Out Tracking Page


10CCVPN Integration Test CasesCMCC

Yan Yang

Yang Xu (liaison)


64% WIP

EFFORT TO COMPLETION: 14 DAYS

CCVPN -Test StatusDemoed at ONS Europe. The optical equipment has delivered to CMCC, and they are manually testing the optical equipment.


Deploy ONAP using OOM  basically completed: DONE

Huawei sotn manual testing have completed

ZTE sotn manual testing has finished

Finished resource design (resource template import) and service design

SDC-1916

(set a meeting with them tonight)

11

VFW HPA Testing

(Test Plan 1 in

HPA & Cloud Agnostic Intent - R3 Test Plan)
Intel / Windriver

40% WIP

EFFORT TO COMPLETION: X DAYS

10 days

vFW with HPA Integration Test - Test Status

The testing has been started at Intel, and start testing at SB-06 with HPA.

  • Registered 3 cloud regions with ONAP
  • Created 3 HPA flavors in each of the cloud
  • Triggered multicloud plugin registration and confirmed that the HPA capabilities of the flavors were discovered. The HPA capabilities of the flavors showed up when AAI was queried.
  • Put in policy for the first test case, created service instance and confirmed that oof sent the right cloud region for homing and the right flavor directives for each vm.


LIMITING ISSUE

  • We keep running into issues in our OOM ONAP install on SB06 and a lot of time is spent trying to fix it and redo our previous work

NEXT STEPS

  • Onboard new VFWHPA heat templates
  • Create VNF to use cloud homing info and flavor directives (and vnic type in case of SRIOV NIC)
  • Create VF module to use cloud homing info and flavor directives (and vnic type in case of SRIOV NIC)
12Change Management - Flexible Designer & Orchestrator Intel / Windriver

66% COMPLETED

EFFORT TO COMPLETION: 5 DAYS


SO-1214 - Getting issue details... STATUS

Testing in progress on SB-04

1) SO uploading a list of activities/building blocks to SDC - successfully tested

2) Design workflow in SDC and distribute to SO is completed successfully! Thanks to Michael & Priyanshu for resolving issues.

3) Deploy workflow in SO and orchestrate the execution of the workflow - To Do


SME contention

13Change Management - Traffic Management-Intel / Windriver

Lukasz Rajewski

Tomasz Osinski

COMPLETED ON STAGING

RETEST ON RELEASE


Testing completed by Orange (Lukasz and Tomek) in SB-07 using vFW

-Must be retested with OOM

14Change Management - 5G PNF in-place software upgradeIntel / Windriver

COMPLETED ON STAGING

RETEST ON RELEASE


Testing completed by Huawei (Yaoguang) in Huawei lab using EM and PNF emulator. Retested in Windriver lab OOM env (Yang Xu).
15Change Management - Schedule optimizationIntel / Windriver

COMPLETED ON STAGING

RETEST ON RELEASE

Functional testing completed. E2E testing in Dublin.


Functional testing completed by Jerry in OOM Staging Daily Windriver.