Date

Attendees

DISCUSSION ITEMS LOG


CtgryItemWhoNotes

Pltfm


PLATFORM TOPICS:

Controller to NF Association

R5/R6 Topic

See Slides Nov 6, 2018. Development of Controller to NF assignment association S/W.

CDS, VF-C, APP-C, SDN-R, SDN-C; will the CCSDK "merging" of controllers happen in R6?

USE CASE REALIZATION MEETING (Notes 2018-11-6) Ctrl-NF

Pltfm

PLATFORM TOPICS:

Data Persistency, RunTime DB

STATUS: Work for RunTime DB completed, not merged in R4

Dan Timoney moved to R5, one Jira for RunTime DB. One issue about merging.

ONAP code added can take a test ONAP deployment to have the ConfigDB work.

USE CASE REALIZATION MEETING (Notes 2019-01-30) U/C Cross-Interaction, Persistency

CONFIGURATION PERSISTENCE SERVICE R6

Pltfm

PLATFORM TOPICS:

Controller LCM API Evolution

https://wiki.onap.org/download/attachments/50202249/2019-04-09%20ONAP_LCM_API_Evolution_El_Alto.pptx?api=v2

Goals (Architecture Evolution)
  • Target is common LCM API in CCSDK usable by different controller personas to simplify for both clients and controller implementations
  • Support PNFs for applicable LCM operations in a consistent way
  • Enable use of CDS blueprint processor to customize behavior of LCM operations in the 'self-service' category
    • In ONAP R4, CDS can be used for pre/post-instantiation configuration. Generic and model-driven design should allow CDS usage to be extended for additional operations and use cases.
  • Evolution steps that preserve backwards compatibility for clients

Present at the Arch S/C Apr 9 (Tue) second presentation.

Use Cases

USE CASE/5G:

RAN (ORAN-3GPP) Standards harmonization with ONAP

  • Orchestration at the Edge.
  • A1/O1/E2 communications. Edge to ENBs, Telemetry.
  • E2 will not have this info. O1 is I/F for PM counts. Not a management I/F.
  • WG3 (ORAN) is defining this.
  • ONAP w/ O1. Changes w/ O1 interface.
  • How to satisfy A1/O1 and in what time-frame.
  • U/C ORAN - ONAP harmonization. 3GPP ORAN ONAP.
  • Starting a new U/C in 5G. Marge, Vimal, Fred Feisullin
  • Edge inventory & topology. Transport BH consideration w/ real-time near-RT aspects
  • Akraino. MEC. Edge automation (Ramki).

Use Case WIKI: MOBILITY STANDARDS HARMONIZATION WITH ONAP

Use Cases

USE CASE/5G:

Licensing Management

New U/C added to the 5G Use Cases for Licensing Management

Use case Wiki: LICENSING MANAGEMENT

(Oct 8 2019) Arch Samuli presented on Licensing Management. Object development. Modeling S/C.

Modeling work: ONAP R6 Modeling High Level Requirements

Use Cases

USE CASE/5G:

OOF / SON / PCI

PoC for December 2019?

SDN-R south-bound NetConf I/F w/ model

and also integration with Runtime DB work.

Use Cases

USE CASES:

BBS U/C Evolution

BBS Evolution - Slide set linked in R6 proposed U/C. List of proposals & functional requirements.

  1. Change Service - want to use ONAP platform.
  2. Full Closed Loop for Fault Management - CLAMP.
  3. Service Update API (SO) - will be developed

https://wiki.onap.org/download/attachments/60887504/BBS_R5_v1.pptx?version=1&modificationDate=1554180715000&api=v2

Use Cases

USE CASES/5G:

PM Dictionary/FM MD GUI

FM META DATA & PM DICTIONARY in R5
Use Cases

USE CASES/5G:

PNF S/W Upgrade

PNF software upgrade in R6 Frankfurt
Use Cases

USE CASES/5G:

Preonboarding/Onboarding

PNF PREONBOARDING / ONBOARDING in R5
Use CasesUSE CASES:

IoT Service Creation

IoT Create Services on 5G

5G Use Cases in R6 Frankfurt

June 19, 2019

Use Cases

USE CASES:

Modeling gNB/5G RAN

Align, harmonize, reconcile various information models to ONAP model:

Expand & verify model and harmonize with the ONAP internal information & data model:

ETSI SOL001 ... 007 with ONAP internal Model

PNFD modeling (Model S/C)

5G Model (3GPP, RAN)

ORAN (WGs, RAN)

Open ROADM (reconfig optical add/drop multiplexer, Optical)

ONF (Optical)

ISOMII (Optical)

OTCC (Optical transport config & control)

 - Use Cases that need transport models need some model consistency.

 - Try a Use Case with extended ONAP model & real equipment.

ORAN Model PlugFest (Dec 2019)

Use Cases

USE CASES:

5G NRM (Network Resource Model) Configuration

yaoguang wang

Presented at the 2019 June LFN DDF, titled as '5G Provisioning management service to NRM

(Oct 9 2019) Presented at CDS team and discussed with Yuriy and Seshu; presented at Resource Modeling S/C. Slides will be updated and re-presented.

5G Network Resource Model (NRM) Configuration in R6 Frankfurt

Arch

Architecture S/C

PNF POB/OB Flow

Arch S/C Information Flows:

Draft ONAP Information Flows

New Information flow for Preonboarding/Onboarding xNF packages/resources.

ARCHCOM: InfoFlow - Onboard Resource into SDC Flow

TSC

TSC:

PoC Definition

POC definition
TSC

TSC/USE CASES:

Test Automation Progress

Use Case Test Automation

Action Items: Use case subcommittee to reach the Dublin use case owner to provide the following information. what's the current percentage of testing automation regarding your use case and functional requirements; what will be the plan to be 100% and constraints (resources availability etc.)


R6 Frankfurt / M0

Use Case Tracking Template

Need the U/C teams to fill out the Dev. Impacts.

More Generalized Use Case Template (discussed w/ Model team):

Use Case Tracking Template and Use Case Template


VID: Service Models Browser Orchestration

VID: Service Models browser - display orchestration type (macro / a`la carte) use-case.

This use-case requires us to extend the AAI data-model, with an additional field, related to Service Model.

This field will be used later on to indicate in VID the Service Model orchestration type.

A&AI Epic 2594 AAI-2594 - Getting issue details... STATUS





Frankfurt Release Requirements

KEY PRESENTATIONS & OVERVIEWS & RECORDINGS

DATETOPICPRESENTERDESCRIPTION
Apr 10, 2019Controller LCM API Evolution
  • Target is common LCM API in CCSDK usable by different controller personas to simplify for both clients and controller implementations
  • Support PNFs for applicable LCM operations in a consistent way
  • Enable use of CDS blueprint processor to customize behavior of LCM operations in the 'self-service' category
    • In ONAP R4, CDS can be used for pre/post-instantiation configuration. Generic and model-driven design should allow CDS usage to be extended for additional operations and use cases.
  • Evolution steps that preserve backwards compatibility for clients

https://wiki.onap.org/download/attachments/50202249/2019-04-09%20ONAP_LCM_API_Evolution_El_Alto.pptx?api=v2

May 1, 2019A&AI GraphGraph Visualizer

Visualizer for A&AI Model Layout

Use Case Realization Call: May 1, 2019

May 8, 2019A&AI Model Browser, Sparky

A&AI developer Model Browser to navigate and viewing attributes, object types & edge view

Recording & Slides: Use Case Realization Call: May 8, 2019

May 15, 2019A&AI Run Time Browser (Sparky)A&AI Run-Time Browser
May 22, 2019Edge Automation Overview & Discussion

Central & Distributed Edge ONAP configuration.

Topics include: Onboarding, Instantiation, Edge Orchestration, A&AI, Architecture, Work-flows, Multi-Tenancy

Use Case Realization Call: May 22, 2019

May 29, 2019Modeling S/C , Use Case Project Teams, Architecture S/C Way of Working

Model S/C (Sub committee) contributions page:

Modeling sub-committee Contributions

https://wiki.onap.org/display/DW/Proposed+ONAP+Release+Process+Updates+for+Information+and+Data+Modeling

Jun 5, 2019Use Case slides for Dev. ForumUse Case Realization Call: June 5, 2019
July 10, 2019R6: PNF Software Upgrade Overview & Discussion

ONAP Read the Docs/R4 Announcements

WIKI: PNF software upgrade in R6 Frankfurt Overview & Presentation

July 24, 2019R6: OOF/SON PCI Use Case Demo, Overview & DiscussionOOF / PCI / SON Use Case Demo
Aug 7, 20195G NRM (Network Resource Model) Configuration U/C Overviewyaoguang wang5G NRM (Network Resource Model) Configuration U/C Overview & Presentation
Aug 14, 2019ORAN Standards Harmonization U/C OverviewORAN Standards Harmonization U/C Overview & Presentation
Aug 21, 2019Modeling Sub-Committee guidelines & Use Case Interactions

Modeling S/C Process Wiki: Proposed ONAP Release Process Updates for Information and Data Modeling

Use Case Tracking Template and Use Case Template

R6 Modeling High Level Requirements Planning Page: ONAP R6 Modeling High Level Requirements

Sept 4, 2019Licensing Management OverviewIntroduction of Licensing Management in R6
Sept 11, 2019SDC & R6 Use Case Impacts DiscussionOfir SonsinoDiscussion with SDC PTL Ofir w/ the Use Case Teams and SDC commitments. See the summary Table for SDC impacting Use Cases.
Sept 18, 2019

VID & R6 U/C Discuss

Preparation for Technical Conference Antwerp

Ittay Stern

Use Case Teams

Discussion with VID PTL (Ittay Stern) for R6 Use Case Impacts discussion and commitments for VID impacting Use Cases

Preparing slides for Use Cases at the Technical Conference Antwerp (for 5G/PNF use cases)

Sept 25, 2019A&AI & R6 Use Case Impacts Discussion

Discussion with A&AI PTL (Jimmy Forsyth) and Chandra Cinthala for R6 A&AI Use Case Impacts discussion and commitments.

Use Case Realization Call: September 25, 2019

Oct 2, 2019DCAE & R6 Use Case Impacts DiscussionVijay Venkatesh KumarDiscussion with DCAE PTL (Vijay Kumar) for R6 Use Case Impacts discussion and commitments for DCAE impacting Use Cases
Oct 9, 2019M1 U/C discussionUse Case Teams

R6 M1 Deadline (Oct 10 2019)

M1 Checklist: Deliverables for Planning Milestone Checklist Template

READ THE DOCS: http://onap.readthedocs.io/en/latest/guides/onap-developer/developing/index.html  > USER GUIDES > Verified Use Cases

and discussion with A&AI (James Forsyth ) continuing discussion from Sept 25.

Network Slicing has two proposals in R6 (LIN MENG CMCC and Swaminathan Seetharaman ). Need to align the two proposals and present at Use Case S/C meeting (Alla G.) and TSC and Architecture next week Oct 14.

 

PoC Planning & DiscussionTracy Van Brakle

Combination Plugfest & PoC 1st week of December bringing together subset of ONAP modules as SMO (svc mgmt orchestration) layer w/ other artifacts from ORAN S/W (LF). LF will publicize. Planned June 2020.

Follow Nokia & Ericsson discussion call:

Plug Fest Planning Discussion Oct 28, 2019

 




 

OOF & R6 Use Case Impacts DiscussionShankar PN

Discussion with OOF PTL (Shankaranarayanan Puzhavakath Narayanan ) for R6 Use Case Impacts discussion and technical details for OOF impacting Use Cases

x, 2019SO & R6 Use Case Impacts DiscussionDiscussion with SO PTL (Seshu Kumar) for R6 Use Case Impacts discussion and commitments.
x, 2019Release Manager DiscussionDavid McBride

Discussion with David McBride of the Linux Foundation, the R6 Release Manager regarding practices, wiki page updates, Jira dashboard and what is a use case?

Release Planning: Frankfurt

Frankfurt Release Requirements

x, 2019RunTime DB DiscussionDiscussion of the RunTime DB Use Case in R6 Frankfurt which introduces a Common Service Data Layer for a data lake to store configuration and operational parameters.
x, 2019Discussion of Use Case Template for R7

Filling out, describing and creating the Wiki for a Use Case

Use Case Tracking Template and Use Case Template

Proposed Functional Template for Use Cases













DISCUSSION ON PLUGFEST

QUESTION: Can we show things already Demoed? Yes. It is good to demo the "basic" stuff because the ORAN people in attendance are new to the ONAP use cases.

QUESTION: Who is the audience? ORAN (new members), ONAP. Held worldwide

QUESTION: How long will we have for each demo? 10 minutes, 5 min of Q&A, + a few minutes for logistics changing of demos.

QUESTION: New S/W Code, Demo R5/R6? No new S/W build is expected

QUESTION: Simulators vs Real DUs? Simulators can be used.

QUESTION: Timeline for development ends end of Oct/beginning of Nov? No new S/W is expected to be developed.

QUESTION: Slideware? Context, give Background. of the 10 min a few minutes to set the stage w/ slides. linkages to ORAN & ORAN S/W community. 3-4 slides Max. ORAN would request a separate break-out sessions for more information.

QUESTION: Commitment from Vendors?

  • PNF PnP - Nokia ("basic PnP"); Oskar, Ericsson variant of PnP. Samsung; Comscope AirSpan Altiostar. Not all confirmed.
  • Bulk PM - Ericsson (confirmed). Nokia (may demo).
  • Basic Fault Flow - WG4 M-Plane Specification. NetConf notifications. O1 FM Data in VES Message format. SCNR development, grab message from DMaaP
  • Basic Config Flow - Trigger from PNF from Portal; NetConf & VES. Martin Skorupski.
  • WG4 Open FH - Simulators. MPlane. Two vendors tentative. Interwork with Beijing lab.
  • SON/OOF/PCI - Two vendors tentative. Altiostar

QUESTION: Actual Demo Day? Thursday December 5, 2019. 10AM EST (USA GMT-5) to Noon.Interworking many labs. ONAP integration PTL Morgan Richomme

  • LOCATION: Rutgers WinLab (5G cosmos research foundation testbed)
  • LOCATION: Orange Lab (Sofia Antipoli France).
  • LOCATION: AT&T in Washington Redmond (USA).
  • LOCATION: 5G Testbed in Murray Hill NJ (USA) Nokia.
  • LOCATION: AT&T Bedminster.

QUESTION: Missing Page OOF/SON/PCI - will be added.

QUESTION: Is there a dedicated Wiki page yet? In O-RAN-SC OAM wiki and SDN-R wiki.  

QUESTION: Co-Demoing - ok for multiple companies to demo, that is great, encourage. Good to show that multiple companies are involved in a use case, that there is interest and multiple streams of development.

  • CO-DEMO LOGISTICS - want to have vendors have equal attention and don't run out of time.

QUESTION: NSF Power initiative (future).

QUESTION: Zoom, recording, Posted to ORAN, ONAP wiki.

QUESTION: Will there be a Panel Discussion? yes we are. details

QUESTION: Schedule - first two days for settings, setup. third day will be a demo day everyone is recording preparing slides.

QUESTION: In person F2F Logistics - details forthcoming. park. contact #s. Address.


SUPPORTING DOCUMENTATION

DocumentFile






RECORDING

RecordingFILE
Zoom Video & Audio (MP4)
Audio Only (M4A)
Playback (M3U)
Chat (Txt)