The goal of this page is to gather from every team their needs in term of lab requirements. In Amsterdam we have been using extensively Windriver cloud and while the current Windriver infrastructure will remain in place for Beijing, we need to insure we are provisioning adequate lab resource for Integration testing.

see https://lists.onap.org/pipermail/onap-discuss/2017-November/006619.html

2 flavors of requirements have been so far identified:

  1. Minimum set for Functional Testing
  2. Minimum set for geo-Redundant Testing

For each flavor, could you fill out the table below with your estimate. This don't need to be 100% accurate. The goal is the come up with a ballpark estimate so we can budget accordingly. Each row is for one instance of your component. We will take this data an calculate resources needed for "functional test environments" like Integration SB0, SB1 etc and resources needed for H/A and Geo Redundant testing. For HA/Geo Redundant testing provide numbers for each "site" and comment on whether how the numbers change with a two site geo-redundancy (e.g. X2 for Geo Redundancy testing).

HA / Geo-Redundant Testing may not be relevant for all applications (especially those qualified as "Design-Time"), in that case enter NA.


Project Name


Project Tech. LeadMinimum set for Functional TestingMinimum set for HA / Geo-Redundant Testing



CPUMemStorageVMsCPUMemStorageVMs Comments
1A & AI 416G40G2416G80G5/105 VMs for local H/A (2 for application servers, 3 for cassandra cluster).  For geo-redundant config, need 5 in each site
2Application Authorization Framework48G80G2416G100G2
3APPC48G80G148G80G5/9Per site: 3 app (ODL cluster) /2 DB
4CLAMP22G10G222G10G2
5Common Controller SDKNANANANANANANANA

As a library/framework, CCSDK doesn't run standalone, so does not need its own VMs

6DCAE1020G100G2

26/54

50G/106G

200G/500G

13/20

Note: 1) the mim for functional testing is for the "lab configuration" to be delivered as part of R2; 2) for HA requirements, the first number is w/o CDAP, the 2nd number is with; 3) geo-red can be HA requirements per site
7DMaaP

4

8

8

4

4

28

16G

16G

32G

16G

16G

98G

100G

160G

160G

100G

100G

620G

2

2

2

1

1

8

16

8

16

8

8

56

32

16G

64G

32G

32G

176G

200

160G

320G

200G

200G

1TB

4

2

4

2

2

14

MR

DRPS

DRNS

DBC

Bridge

TOTAL

9External API FrameworkNANANANANANANANANA based in Brian F suggestion
10Holmes42G10G142G10G2
12Logging Enhancements Project

4-8

8-16G80G18-16

16-32G

160G2

ELK stack

13Microservices Bus416G10G1416G10G2
14Modeling48G20G348G20G4
15Multi VIM/Cloud416G40G4416G40G4
16ONAP CLI12G20G112G20G1
17ONAP Operations Manager (OOM)

6 + 114 + (8 to 32) =

128 - 152

12G + 268G + 64G = 354G3G + 100G + 120G = 223G3 + 29 + 1 = 3316 to 64128G240G2

OOM as an ONAP Deployment (like the demo project)

(OOM itself is infrastructure undercloud)

18ONAP Optimization Framework








19Usecase UI22G10G122G10G2
20Policy Framework616G10G1616G10G2
21Portal Platform28G20G128G20G2
22SDN-C48G80G148G80G7/14

7 VMs needed for local HA (3 controller tier / OpenDaylight + 2 database tier + 2 web tier). Double that for geo redundancy.

23Service Design & Creation816G100G1816G100G4/8for HA we need 4 VM FE/BE/CS/ES and Double that for geo redundancy.
24Service Orchestrator48G80G148G80G2/42 VMs for local HA (4 for geo distribution, considering 2 replicas)
25VF-C: Virtual Function Controller816G80G1816G80G2
26VID22G10G122G10G2
27VNF SDK44G80G1
NA (design time component)




28VNF RequirementsNANANANANANANANAAs documentation directed to VNF Providers, VNFRQTS does not need run time resources
29VNF Validation (VVP)48GB20GB348GB100GB7