You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 9 Next »


Early Drop testing will focus on automated testing via robot and other test scripts. We will not have 100% coverage but should have enough sanity testing to confirm the changes for El Alto have not  created  breakage.

WORK IN PROGRESS - focus will be automated testing so some rows will be deleted from the table - this is a copy of Dublin as a starting point to trim down

Color Guide

For 2019-08-01 - ONLY Completed items should be green. 

COMPLETED

PROGRESSING >= 90%

PROGRESSING <90%

#


Use Case

Functional Requirement

Nonfunctional Requirement

Test CasesLabIntegration Test Lead

Status

(remaining days of effort)

Video URL

Detailed Test Status

Quick Notes
1

vFW

Model Driven Control Loop Design 

vFW


(vDNS is part of scale out use case below #10)


Intel / Windriver

Planned





2Use Case: Residential Broadband vCPE (Approved)

vCPE Integration Test Case

Intel / Windriver

Planned




3vCPE with TOSCA

vCPE(tosca) with HPA - Integration test cases

Intel / Windriver











45G - Realtime PM and High Volume Stream Data Collection5G - Real Time PM and High Volume Stream Data Collection - Integration Test Cases

Intel / Windriver

Planned

(hv-ves ete script)




55G - PNF PnP

5G - PNF PnP - Integration Test Cases

Intel / Windriver

Planned

Heat and Tosca




6 5G - Bulk PM

5G - Bulk PM - Test Status

Intel / Windriver

SB-02

Andrew to check

(Rachel ?)




75G - Configuration with NETCONF

5G - PNF Configuration via Netconf - Test Status

Intel/

Windriver


Andrew to check

(Rachel ?)






8

5G - Preonboarding/Onboarding - Test Status

Intel / Windriver

PNF Preonboarding (VNF SDK):

Marcin Przybysz

Krzysztof Kuzmicki

Dermot Melia

PNF Onboarding (SDC):

Andy Walshe

Planned





95G - OOF and PCI 

5G - OOF and PCI - Integration Test Cases

Windriver

N/A



No automation done yet, and not planned for El Alto. We will be doing some manual tests.
10Scale Out

Scale Out - Integration Test Cases and Status (vLB)

Intel / WindriverPlanned



11CCVPNCCVPN Integration Test CasesCMCC

Hardware required not known if in ED testing scope





12HPA vFW/vDNS

vFW/vDNS HPA Testing

(Test Plan 1 in

HPA & Cloud Agnostic Intent - R3 Test Plan)
Intel / Windriver

Planned




13Change Management - Flexible Designer & Orchestrator

Steps:

1) Designing custom workflows with Workflow Designer

2) Distributing custom workflows to SO

3) Deploying the custom workflow in SO

4) Sending workflow metadata to VID

5) Triggering custom workflow execution from VID

6) Executing custom workflows in SO

Intel / Windriver


Most likely




14

Traffic Distribution

Change Management Dublin Extensions

Steps:

1) Creating VNF profile using CDT

2) Designing custom workflows with Workflow Designer

3) Distributing custom workflows to SO

4) Deploying the custom workflow in SO

5) Sending workflow metadata to VID

6) Triggering custom workflow execution from VID

7) Executing custom workflows in SO

Intel / Windriver

Brian to follow Lukasz






15Change Management - 5G PNG Software Upgrade

Change Management - 5G PNF Software Upgrade Integration Test Status

Intel / Windriver

unlikely




16Change Management - Schedule Optimization
Intel / Windriver

unlikely




17BBS Broadband Service Use Case (Dublin)BBS Use Case Tracking (Dublin Release)#TestingBBS Swisscom Lab

Requires Swisscom Lab




18VSP Compliance Check within SDC (Dublin) - Phase 1VSP Compliance Check within SDC - Integration Test PlanVodafone





19K8S based Cloud Region Support - vFW Use caseDeploy vFW Helm Chart using Multicloud K8s Plugin in Kubernetes Cloudintel / Windriver






20K8S based Cloud Region Support - EdgeXFoundry Use caseDeploy EdgeXFoundry Helm Chart using Multicloud K8s Plugin in Kubernetes CloudIntel/ Windriver







215G: Network Slicing Modeling
Amdocs





25Improve our E2E Process Automation

Planned

Abdel with automated robot




30SOL 004 (VNF Package Security)

5G - Preonboarding/Onboarding - Test Status

Ericsson, Intel / Windriver

Possibly with PNF pre-onboarding




31xNF communication security enhancements.xNF communication security enhancements - Tests Description and Status
Planned to add CSIT


34HPA vIPsecvIPsec HPA testingIntel / WindriverPlanned


35Health Checks for PODSPercentage coverage of Health Checks for Running PODSIntegration



36New Installation Tests in 3 labs








Intel/Windriver

Planned




Orange

Planned




TBD Lab #3

Investigating




OWL ?

Brian to to talk to Tracy



Robot Keyword Testing








init_robot

PASS - staging




init

PASS - staging

AAI/AAF authentication work around


health







eteHelm-k8.sh

43/49 PASS - staging

CLAMP, OOF-CMSO , Policy, Portal, SDNC (zero length response from 1 pod), SO (2 pods)


healthdist




SDC group type doesnt exist error at Catalog Resource


instantiateVFWCL




Same error as healthdist

8/14/2019

SB-00 - oom-staging for testing 43/49 working. up to SDC model onboarding healthdist stage.

            cassandra config issue for SDC - re-deploying SDC ; Cassandra tuning for windriver with multiple clients ?

integration-staging-daily - day of testing

integration-release-daily  - day of testing


SB01/SB02 - shutdown for resources



Labs for Testing


Integration Team:

Integration-release-daily: this should be main lab for automated script testing

Integration-staging-daily: for patch testing in advance of updates to release-daily

Integration-SB00

Integration-SB04


Project Teams

Integration-Design (Available) :   SDC model onboarding and distribution

Integration-Instantiation (In Progress) :   VID instantiate to VNF deployed - DEFERRED

Integration-ClosedLoop (Available) :  VNF already instantiated. DCAE, Policy, AAI, APPC,SDNC  flows








  • No labels