You are viewing an old version of this page. View the current version.

Compare with Current View Page History

Version 1 Next »

Color Guide

ONLY Completed items should be green. 

COMPLETED

PROGRESSING >= 90%

PROGRESSING <90%

#


Use Case

Functional Requirement

Nonfunctional Requirement

Test CasesLabIntegration Test Lead

Status

(remaining days of effort)

Video URL

Detailed Test Status

Quick NotesDoc status

CI integration*


1

vFW

Model Driven Control Loop Design 

vFW


(vDNS is part of scale out use case below #10)


Intel / Windriver







2Use Case: Residential Broadband vCPE (Approved)

vCPE Integration Test Case

Intel / Windriver





3vCPE with TOSCA

vCPE(tosca) with HPA - Integration test cases

Intel / Windriver







45G - Realtime PM and High Volume Stream Data Collection5G - Real Time PM and High Volume Stream Data Collection - Integration Test Cases

Intel / Windriver







55G - PNF PnP

5G - PNF PnP - Integration Test Cases

Intel / Windriver





6 5G - Bulk PM

5G - Bulk PM - Test Status

Intel / Windriver

SB-02







75G - Configuration with NETCONF

5G - PNF Configuration via Netconf - Test Status

Intel/

Windriver







8

5G - Preonboarding/Onboarding - Test Status

Intel / Windriver

PNF Preonboarding (VNF SDK):

Marcin Przybysz

Krzysztof Kuzmicki

Dermot Melia

PNF Onboarding (SDC):

Andy Walshe







95G - OOF and PCI 

5G - OOF and PCI - Integration Test Cases

Windriver





10Scale Out

Scale Out - Integration Test Cases and Status

Intel / Windriver





11CCVPNCCVPN Integration Test CasesCMCC





12HPA vFW/vDNS

vFW/vDNS HPA Testing

(Test Plan 1 in

HPA & Cloud Agnostic Intent - R3 Test Plan)
Intel / Windriver





13Change Management - Flexible Designer & Orchestrator

Steps:

1) Designing custom workflows with Workflow Designer

2) Distributing custom workflows to SO

3) Deploying the custom workflow in SO

4) Sending workflow metadata to VID

5) Triggering custom workflow execution from VID

6) Executing custom workflows in SO

Intel / Windriver





14

Traffic Distribution

Change Management Dublin Extensions

Steps:

1) Instantiation of vFWDT

2) Configuration of OOF Policies for vFWDT

3) Execution of OSDF/HAS requests for data collection

4) Configuration of VNF profiles in CDT

5) Configuration of Ansible Server

6) Execution of TD workflow


Intel / Windriver





15Change Management - 5G PNG Software Upgrade

Change Management - 5G PNF Software Upgrade Integration Test Status

Intel / Windriver





16Change Management - Schedule Optimization
Intel / Windriver





17BBS Broadband Service Use Case (Dublin)BBS Use Case Tracking (Dublin Release)#TestingBBS Swisscom Lab





18VSP Compliance Check within SDC (Dublin) - Phase 1VSP Compliance Check within SDC - Integration Test PlanVodafone





19K8S based Cloud Region Support - vFW Use caseDeploy vFW Helm Chart using Multicloud K8s Plugin in Kubernetes Cloudintel / Windriver





20K8S based Cloud Region Support - EdgeXFoundry Use caseDeploy EdgeXFoundry Helm Chart using Multicloud K8s Plugin in Kubernetes CloudIntel/ Windriver






































24

ETSI Alignment

SO plugin to support SOL003 to connect to an external VNFM









25Improve our E2E Process Automation







26S3P - Footprint Optimization (Integration with Alpine)







27Component/memory optimization: Ongoing Assessment







28Global optimization (e.g. shared DB) - stretch goal=shared PostgreSQL; shared MariaDB







29S3P- Geo-Redundancy







30SOL 004 (VNF Package Security)

5G - Preonboarding/Onboarding - Test Status

Ericsson, Intel / Windriver





31xNF communication security enhancements.xNF communication security enhancements - Tests Description and Status






32Locale/Internationalization language support







33









34HPA vIPsecvIPsec HPA testingIntel / Windriver





35Health Checks for PODSPercentage coverage of Health Checks for Running PODSIntegration





36New Installation Tests in 3 labs










Intel/Windriver 








Orange  (Rocky)
Morgan Richomme







Ericsson Lab  (Rocky)


















Robot Keyword Testing










init_robotPASS








initPASS








healthPARTIAL








eteHelm-k8.shPARTIAL








healthdistPASS








instantiateVFWCLPASS








vfwclosedloop <png_ip>PASS








instantiateVFWDTPASS








distributeVCPEResCustPASS








sdc-dcae-d









vcpe.py

init: PASS

infra: PASS

custservice:

PASS

loop: PASS

noloss: PASS











postinstallPASS


















72 Hour Stability Runonboard/instantiatePASS








closedloopPASS







HTTP Certificate Expiry Test

(verify_cert.sh)



clamp 3/2020

dmaap 3/2020












































































































DCAEGEN2-1539 - Getting issue details... STATUS


*: CI integration: the goal is to introduce the use case in CI daily chains for Frankfurt. Ths table could be completed with a CI dashboard where the use cases will be run every day.

As it should be runnable in any lab, some constraints need to be considered:

  • no proprietary VNFs                                            
  • use cases must be self-content , third party equiments may not be present in all labs.
  • infrastructure setup/teardown shall be clear: the use case must be runnable from a clean ONAP installation. These resources must be cleaned at the end of the test ,
  • results shall be pushed to a common DB. It is recommended ot use xtesting to run the tests (robotframework, python, bash, unit test drivers)








  • No labels